  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
QI-130 Perform Incoming Quality Assurance 20/21 193/199 23% 100% 100% 🔴 RED

QI-130 Totals: 20/21 L3 in-scope · 3/13 config complete · 0/0 Fit · 15/15 RICEFW complete · 7/7 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

QI-130 — Perform Incoming Quality Assurance

Metric Value
Config Items Required 13
Config CDD Complete 3
Average Completion 23%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW

QI-130: 0/0 Fit-to-Standard (0%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
QI-130 Perform Incoming Quality Assurance 15 15 0

QI-130: 15/15 complete (100%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
QI-130 Perform Incoming Quality Assurance 7 7 0 100% 0

QI-130: 7/7 ECA complete (100%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 QI-130 Config Incomplete Config at 23% (3/13) 🔴 HIGH

Summary: 🔴 1 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW