🏠 Home PTP Tower RICEFW Tracker 📝 ADA Editor ↗
IAO Architecture

QI-130 — Perform Incoming Quality Assurance

RICEFW Object Tracker

Procure to Pay (PTP) Tower
Capability QI-130 · QI Quality Management (Incoming)

IAO Program · R1 – R5
Generated: May 2026
Sajiv Francis

IAO Architecture Pipeline — Intel Confidential

Table of Contents

1. Executive Summary

This tracker provides the development object inventory and build progress for Procure to Pay (PTP) — QI-130 Perform Incoming Quality Assurance.

Metric Value
Total Dev Objects 22
S/4 RICEFW Objects 15
ECA Objects 7
Active (In Progress) 0
Completed 22
Rejected / Cancelled 0
S/4 RICEFW Breakdown 3 Interfaces, 3 Conversions, 8 Enhancements, 1 Forms
ECA Breakdown 6 ECA Views, 1 ECA Reports

2. Dev Object Inventory

2.1 Summary by Type

Type Code Count % of Total
Interface I 3 14%
Conversion C 3 14%
Enhancement E 8 36%
Form F 1 5%
ECA View EV 6 27%
ECA Report ER 1 5%
Total 22 100%

2.2 Summary by Status

Status Count % of Total
Completed 22 100%

3. S/4 RICEFW Objects

3.1 Interfaces

Completed (3):

Object ID Description Source → Target Middleware Complexity
PTPI1154 ILM to SAP S4 Interface – Assigning Material to Inspection Plan ILM → S/4 NA 03.Medium
PTPI1153 Interface from ILM to SAP S/4 - Create/Modify Quality Info records ILM → S/4 NA 03.Medium
PTPI1032 MQCS data pull Interface MQCS → S/4 MULESOFT 03.Medium
### 3.2 Conversions

Completed (3):

Object ID Description Source → Target Middleware Complexity
PTPM0008 Quality Info record upload [T-Code - QI01] NA N/A
PTPM0007 Inspection Plan upload [T-Code - QP01] NA N/A
PTPM0006 Master Inspection Characteristics upload [T-Code - QS21] NA N/A
### 3.3 Enhancements

Completed (8):

Object ID Description Source → Target Middleware Complexity
PTPE1603 Enhancement to Auto block the Expired Batches in IM Locations NA 03.Medium
PTPE1099 Exception Notification – Label printing functionality – IF only NA → NA NA 03.Medium
PTPE1036 Batch update Program NA 03.Medium
PTPE1033 UD Enhancement NA 03.Medium
PTPE1031 Send email notification with details of task for Quality notification – IF only NA 03.Medium
PTPE1030 Creation of Return PO from Action box within Notification – IF only NA 03.Medium
PTPE1029 Creation of Notification as a follow up action with rejection codes – IF only NA 02.High
PTPE0977 Develop app/transaction to Automate the stock from ‘Unrestricted/Blocked to Q… NA 03.Medium
### 3.4 Reports

No report objects for this capability.

3.5 Forms

Completed (1):

Object ID Description Source → Target Middleware Complexity
PTPF1384 Exception Notification – Label printing functionality – IF only NA 03.Medium
### 3.6 Workflows

No workflow objects for this capability.

4. ECA Objects

4.1 ECA Views

Completed (6):

Object ID Description Sub-Tower Complexity
PTPV082 Quality Notification Item 6.8 PTP - QM
PTPV083 Quality Notification Header 6.8 PTP - QM
PTPV084 Quality Notification Resolution Task 6.8 PTP - QM
PTPV085 Quality Inspection Type Item Plant 6.8 PTP - QM
PTPV086 Quality Notification Resolution Task Lifecycle 6.8 PTP - QM
PTPV087 Quality Notification Lifecycle 6.8 PTP - QM
### 4.2 ECA Reports

Completed (1):

Object ID Description Sub-Tower Complexity
PTPXR103 Blocked and QI Stock Report 6.8 PTP - QM 03.Medium

5. Build Progress

5.1 Phase Completion

Timeline data will be populated from Smartsheet Object Tracker.

5.2 Delivery Timeline

Phase statistics will be populated from Smartsheet Object Tracker.

6. Risk Items

RAID items will be populated from the Master RAID Log.

7. Change Requests

144 approved change requests impact this capability.

CR ID Title Priority Release Category Completion New Objs Descoped
INT-CR0016 Blackline vs CFIN JE Tool High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0021 Spares - Quality Management High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0026 Boundary App integration with SAP GTS for Compl… High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0040 R3 Stakeholder Assessment Medium R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0048 Update of build plan and design plan dates for … High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0051 Company code move to difference S4 instance 776… High R3 (Feb 2027) Complete 0.0 0.0
INT-CR0074 Match Trade Flows to Physical Flows Very High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0087 Transportation Management L3’s Reopen High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0168 IP to IF Turn-key Order Process High R3 (Feb 2027) Complete 0.0 0.0
INT-CR0173 ISTART Pega (IAPM ID 37517): Change TIME from M… Medium R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0201 Reopen L3s for Gases/Chemicals R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0205 SCT Control Tower: Manage My Supply Line MSL GF… Medium R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0215 SCT Control Tower: Equipment Item BOM Master Da… Medium R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0224 SAP Role Build to Align to Tower based Apps/Tra… Medium R1 (May 2025) Complete 0.0 0.0
INT-CR0285 OSAT 7B1 integration for IP using SMH High R3 (Feb 2027) Design / Build Gap In Progress 0.0 0.0
INT-CR0288 FDS and Mapping changes for interface PTPI0136/… High R3 (Feb 2027) Complete 0.0 0.0
INT-CR0297 Change request to Enable Acceptance at Origin -… Medium R3 (Feb 2027) Complete 0.0 0.0
INT-CR0334 Cancellation of PTP Objects in Sprint 10 - Build High R3 (Feb 2027) In Progress 0.0 8.0
INT-CR0349 Cancellation of WRICEF - LOGI1063 & LOGI1072 Medium R3 (Feb 2027) In Progress 0.0 2.0
INT-CR0351 Cancellation of PTP- Enable Payable Objects High R3 (Feb 2027) In Progress 0.0 6.0
Showing top 20 of 144 change requests.

Generated by IAO Architecture Pipeline · May 2026 · Intel Confidential