🏠 Home PTP Tower 📝 ADA Editor ↗
IAO Architecture

PM-040 — Process Readiness Detail

Maintain Supplier Certification and Monitor Performance

Procure To Pay (PTP) Tower
Capability PM-040

IAO Program
Generated: May 2026
Sajiv Francis

Companion to PM-040-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
PM-040 Maintain Supplier Certification and Monitor Performance 21/21 76/76 0% 97% 97% 🔴 RED

PM-040 Totals: 21/21 L3 in-scope · 0/24 config complete · 0/0 Fit · 203/209 RICEFW complete · 57/59 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

PM-040 — Maintain Supplier Certification and Monitor Performance

Metric Value
Config Items Required 24
Config CDD Complete 0
Average Completion 0%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW

PM-040: 0/0 Fit-to-Standard (0%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
PM-040 Maintain Supplier… 209 203 6

PM-040: 203/209 complete (97%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
PM-040 Maintain Supplier… 59 57 2 97% 2

PM-040: 57/59 ECA complete (97%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 PM-040 Config Incomplete Config at 0% (0/24) 🔴 HIGH

Summary: 🔴 1 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW


Back to Architecture Document


PM-040 — Process Readiness Detail · Procure To Pay · Generated: May 2026