Procure To Pay (PTP) Tower
Capability LI-200
IAO Program
Generated: May 2026
Sajiv Francis
Companion to LI-200-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| LI-200 | Determine Discrepant Material Disposition | 12/12 | 108/108 | 31% | — | 97% | — | 🟡 AMBER |
LI-200 Totals: 12/12 L3 in-scope · 5/16 config complete · 0/0 Fit · 60/62 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 16 |
| Config CDD Complete | 5 |
| Average Completion | 31% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
LI-200: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| LI-200 | Determine Discrepant… | 62 | 60 | 2 | — |
LI-200: 60/62 complete (97%)
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | LI-200 | Config Incomplete | Config at 31% (5/16) | 🟡 MEDIUM |
Summary: 🔴 0 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
LI-200 — Process Readiness Detail · Procure To Pay · Generated: May 2026