Procure To Pay (PTP) Tower
Capability LI-100
IAO Program
Generated: May 2026
Sajiv Francis
Companion to LI-100-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| LI-100 | Manage Supplier Consignment Stock | 9/9 | 39/39 | 17% | — | 96% | — | 🔴 RED |
LI-100 Totals: 9/9 L3 in-scope · 1/6 config complete · 0/0 Fit · 51/53 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 6 |
| Config CDD Complete | 1 |
| Average Completion | 17% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
LI-100: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| LI-100 | Manage Supplier Consignment Stock | 53 | 51 | 2 | — |
LI-100: 51/53 complete (96%)
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | LI-100 | Config Incomplete | Config at 17% (1/6) | 🔴 HIGH |
Summary: 🔴 1 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
LI-100 — Process Readiness Detail · Procure To Pay · Generated: May 2026