🏠 Home PTP Tower 📝 ADA Editor ↗
IAO Architecture

LI-030 — Process Readiness Detail

Manage In-bound Transportation - PTP

Procure To Pay (PTP) Tower
Capability LI-030

IAO Program
Generated: May 2026
Sajiv Francis

Companion to LI-030-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
LI-030 Manage In-bound Transportation - PTP 16/16 178/178 41% 98% 100% 🟡 AMBER

LI-030 Totals: 16/16 L3 in-scope · 13/32 config complete · 0/0 Fit · 94/96 RICEFW complete · 8/8 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

LI-030 — Manage In-bound Transportation - PTP

Metric Value
Config Items Required 32
Config CDD Complete 13
Average Completion 41%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW

LI-030: 0/0 Fit-to-Standard (0%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
LI-030 Manage In-bound… 96 94 2

LI-030: 94/96 complete (98%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
LI-030 Manage In-bound… 8 8 0 100% 8

LI-030: 8/8 ECA complete (100%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 LI-030 Config Incomplete Config at 41% (13/32) 🟡 MEDIUM

Summary: 🔴 0 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW


Back to Architecture Document


LI-030 — Process Readiness Detail · Procure To Pay · Generated: May 2026