Procure To Pay (PTP) Tower
Capability L-060
IAO Program
Generated: May 2026
Sajiv Francis
Companion to L-060-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| L-060 | Manage Storage and Internal Movement of Inventory - PTP | 0/2 | 0/10 | 67% | — | 97% | — | 🟢 GREEN |
L-060 Totals: 0/2 L3 in-scope · 2/3 config complete · 0/0 Fit · 60/62 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 3 |
| Config CDD Complete | 2 |
| Average Completion | 67% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
L-060: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| L-060 | Manage Storage and… | 62 | 60 | 2 | — |
L-060: 60/62 complete (97%)
All automated risk flags detected across data sources.
✅ No risk flags detected for L-060.
← Back to Architecture Document
L-060 — Process Readiness Detail · Procure To Pay · Generated: May 2026