Forecast to Stock (IF) (FTS-IF) Tower
Capability PE-060
IAO Program
Generated: May 2026
Sajiv Francis
Companion to PE-060-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| PE-060 | Maintain and Manage Master Maintenance Records (IF) | 0/18 | 0/85 | 19% | — | 76% | — | 🔴 RED |
PE-060 Totals: 0/18 L3 in-scope · 6/32 config complete · 0/0 Fit · 61/80 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 32 |
| Config CDD Complete | 6 |
| Average Completion | 19% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
PE-060: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| PE-060 | Maintain and Manage Master… | 80 | 61 | 19 | — |
PE-060: 61/80 complete (76%)
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | PE-060 | Config Incomplete | Config at 19% (6/32) | 🔴 HIGH |
| 2 | PE-060 | RICEFW Incomplete | 19/80 objects not complete | 🟡 MEDIUM |
Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
PE-060 — Process Readiness Detail · Forecast to Stock (IF) · Generated: May 2026