Forecast to Stock (IF) (FTS-IF) Tower
Capability M-170
IAO Program
Generated: May 2026
Sajiv Francis
Companion to M-170-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| M-170 | Control and Report Production Operations (IF) | 2/2 | 10/10 | 0% | — | 88% | 100% | 🔴 RED |
M-170 Totals: 2/2 L3 in-scope · 0/2 config complete · 0/0 Fit · 38/43 RICEFW complete · 3/3 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 2 |
| Config CDD Complete | 0 |
| Average Completion | 0% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
M-170: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| M-170 | Control and Report… | 43 | 38 | 5 | — |
M-170: 38/43 complete (88%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| M-170 | Control and Report… | 3 | 3 | 0 | 100% | 1 |
M-170: 3/3 ECA complete (100%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | M-170 | Config Incomplete | Config at 0% (0/2) | 🔴 HIGH |
| 2 | M-170 | RICEFW Incomplete | 5/43 objects not complete | 🟡 MEDIUM |
Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
M-170 — Process Readiness Detail · Forecast to Stock (IF) · Generated: May 2026