M-100 — Process Readiness Detail

Execute Production (IF)

Forecast to Stock (IF) (FTS-IF) Tower
Capability M-100

IAO Program
Generated: May 2026
Sajiv Francis

Companion to M-100-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
M-100 Execute Production (IF) 15/15 212/212 0% 88% 100% 🔴 RED

M-100 Totals: 15/15 L3 in-scope · 0/12 config complete · 0/0 Fit · 38/43 RICEFW complete · 3/3 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

M-100 — Execute Production (IF)

Metric Value
Config Items Required 12
Config CDD Complete 0
Average Completion 0%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW

M-100: 0/0 Fit-to-Standard (0%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
M-100 Execute Production (IF) 43 38 5

M-100: 38/43 complete (88%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
M-100 Execute Production (IF) 3 3 0 100% 1

M-100: 3/3 ECA complete (100%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 M-100 Config Incomplete Config at 0% (0/12) 🔴 HIGH
2 M-100 RICEFW Incomplete 5/43 objects not complete 🟡 MEDIUM

Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW


Back to Architecture Document


M-100 — Process Readiness Detail · Forecast to Stock (IF) · Generated: May 2026