Forecast to Stock (IF) (FTS-IF) Tower
Capability LO-180
IAO Program
Generated: May 2026
Sajiv Francis
Companion to LO-180-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| LO-180 | Manage Outbound Transportation - FTS (IF) | 5/5 | 56/56 | 67% | — | 100% | 100% | 🟢 GREEN |
LO-180 Totals: 5/5 L3 in-scope · 6/9 config complete · 0/0 Fit · 17/17 RICEFW complete · 1/1 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 9 |
| Config CDD Complete | 6 |
| Average Completion | 67% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
LO-180: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| LO-180 | Manage Outbound… | 17 | 17 | 0 | — |
LO-180: 17/17 complete (100%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| LO-180 | Manage Outbound… | 1 | 1 | 0 | 100% | 1 |
LO-180: 1/1 ECA complete (100%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
✅ No risk flags detected for LO-180.
← Back to Architecture Document
LO-180 — Process Readiness Detail · Forecast to Stock (IF) · Generated: May 2026