🏠 Home FTS-IF Tower 📝 ADA Editor ↗
IAO Architecture

L-060 — Process Readiness Detail

Manage Storage & Internal Movement of Inventory - FTS (IF)

Forecast to Stock (IF) (FTS-IF) Tower
Capability L-060

IAO Program
Generated: May 2026
Sajiv Francis

Companion to L-060-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
L-060 Manage Storage & Internal Movement of Inventory - FTS (IF) 0/23 0/201 42% 92% 100% 🟡 AMBER

L-060 Totals: 0/23 L3 in-scope · 13/31 config complete · 0/0 Fit · 79/86 RICEFW complete · 19/19 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

L-060 — Manage Storage & Internal Movement of Inventory - FTS (IF)

Metric Value
Config Items Required 31
Config CDD Complete 13
Average Completion 42%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW

L-060: 0/0 Fit-to-Standard (0%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
L-060 Manage Storage & Internal… 86 79 7

L-060: 79/86 complete (92%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
L-060 Manage Storage & Internal… 19 19 0 100% 30

L-060: 19/19 ECA complete (100%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 L-060 Config Incomplete Config at 42% (13/31) 🟡 MEDIUM

Summary: 🔴 0 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW


Back to Architecture Document


L-060 — Process Readiness Detail · Forecast to Stock (IF) · Generated: May 2026