Manage Intercompany

Finance Plan To Report (FPR) Tower
Capability DC-110

IAO Program
Generated: May 2026
Sajiv Francis

Companion to DC-110-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
DC-110 Manage Intercompany 5/5 67/67 40% 76% 100% 67% 🟡 AMBER

DC-110 Totals: 5/5 L3 in-scope · 2/5 config complete · 90/119 Fit · 15/15 RICEFW complete · 6/9 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

DC-110 — Manage Intercompany

Metric Value
Config Items Required 5
Config CDD Complete 2
Average Completion 40%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
DC-110 Manage Intercompany 119 90 21 76%

DC-110: 90/119 Fit-to-Standard (76%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
DC-110 Manage Intercompany 15 15 0

DC-110: 15/15 complete (100%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
DC-110 Manage Intercompany 9 6 3 67% 3

DC-110: 6/9 ECA complete (67%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 DC-110 Config Incomplete Config at 40% (2/5) 🟡 MEDIUM
2 DC-110 ECA Incomplete 3/9 ECA objects not complete (67%) 🟡 MEDIUM

Summary: 🔴 0 HIGH · 🟡 2 MEDIUM · 🔵 0 LOW