DC-050 — Process Readiness Detail

Project Accounting

Finance Plan To Report (FPR) Tower
Capability DC-050

IAO Program
Generated: May 2026
Sajiv Francis

Companion to DC-050-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
DC-050 Project Accounting 46/46 304/304 36% 73% 97% 55% 🟡 AMBER

DC-050 Totals: 46/46 L3 in-scope · 14/39 config complete · 416/570 Fit · 84/87 RICEFW complete · 29/53 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

DC-050 — Project Accounting

Metric Value
Config Items Required 39
Config CDD Complete 14
Average Completion 36%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
DC-050 Project Accounting 570 416 137 73%

DC-050: 416/570 Fit-to-Standard (73%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
DC-050 Project Accounting 87 84 3

DC-050: 84/87 complete (97%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
DC-050 Project Accounting 53 29 24 55% 46

DC-050: 29/53 ECA complete (55%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 DC-050 Config Incomplete Config at 36% (14/39) 🟡 MEDIUM
2 DC-050 ECA Incomplete 24/53 ECA objects not complete (55%) 🟡 MEDIUM

Summary: 🔴 0 HIGH · 🟡 2 MEDIUM · 🔵 0 LOW