Finance Plan To Report (FPR) Tower
Capability DC-050 · DC Manage Accounting and Control Data
IAO Program · R1 – R5
Generated: May 2026
Sajiv Francis
IAO Architecture Pipeline — Intel Confidential
Table of Contents
1. Executive Summary
This Architecture Document defines the Business, Data, Application, and Technology (BDAT) architecture for DC-050 Project Accounting within the IAO program. It includes 25 BPMN process diagram(s) in Section 3.
System nodes in architecture diagrams are IAPM-linked where matches exist (0/0 matched) — click any linked node to open its IAPM page. Diagrams require securityLevel: 'loose' for click events.
2. Business Context & Objectives
2.1 Classification
Level
Value
L0 Tower
Finance Plan To Report
L1 Process
DC Manage Accounting and Control Data
L2 Capability
DC-050 - Project Accounting
2.2 Business Drivers
#
Driver
Description
Strategic Alignment
Priority
1
S/4 HANA Finance Consolidation
Migrate legacy costing and reporting platforms to unified S/4 HANA finance backbone
Ensure SOX compliance and audit trail continuity through the ERP transition period
Intel Corporate Compliance
Medium
4
DC-050 Process Migration
Migrate DC-050 business processes and 0 integrated systems from legacy to S/4 HANA target architecture
IDM 2.0 Finance
High
2.3 Success Criteria
Metric
Target
Measure
Baseline
Owner
Month-End Close Cycle Time
< 3 business days
Calendar days from period close trigger to final posting
5 business days (legacy)
Finance Controller
Cost Variance Accuracy
< 0.5% deviation
Variance between standard and actual cost post-migration
1.2% (ICOST baseline)
Cost Accounting Lead
System Availability (Finance)
99.9% uptime
S/4 HANA finance module availability during business hours
99.5% (legacy)
IT Operations
DC-050 Migration Completeness
100% flow chains validated
All 0 flow chains verified in target state
0% (pre-migration)
Tower Architect
2.4 Companion Documents
Document
Description
Business Architecture
Included in this document (Section 3) — process flows from BPMN diagrams
This Document
Full BDAT Architecture — Business + Data + Application + Technology
3. Business Architecture (TOGAF “B”)
3.1 Business Process Overview
This capability includes 25 business process(es) modeled in BPMN 2.0, covering the end-to-end workflow for DC-050 Project Accounting.
#
Step ID
Process Name
Lanes
Tasks
Gateways
1
DC-050-110_Perform_Implementation_Audit
DC-050-110_Perform_Implementation_Audit
Capital Analyst
5
0
2
DC-050-120_Close_Project
DC-050-120_Close_Project
Batch User, CCF Analyst, CES / Intel Products Capital Finance, Capital Analyst, Capital Enterprise Solutions (CES) Analyst, Capital Finance Analyst, Finance Analyst
BUSINESS ARCHITECTURE — 3.2.2 DC-050-120_Close_Project — DC-050-120_Close_Project
Swim Lanes: Batch User · CCF Analyst · CES / Intel Products Capital Finance · Capital Analyst · Capital Enterprise Solutions (CES) Analyst · Capital Finance Analyst · Finance Analyst | Tasks: 18 | Gateways: 10
Legend: ● Start · ● End · User Task · Service Task · ◇ Gateway · Sub-Process
%%{init: {'theme': 'base', 'themeVariables': {'fontSize': '14px', 'fontFamily': 'Segoe UI, Arial, sans-serif','primaryColor': '#e8f0fe', 'primaryBorderColor': '#0071c5','lineColor': '#37474F', 'secondaryColor': '#f5f8fc'}, 'flowchart': {'useMaxWidth': false, 'htmlLabels': true, 'curve': 'basis', 'nodeSpacing': 40, 'rankSpacing': 50}} }%%
flowchart LR
classDef startEvt fill:#4CAF50,stroke:#2E7D32,color:#000,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef endEvt fill:#C62828,stroke:#B71C1C,color:#fff,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef userTask fill:#E3F2FD,stroke:#1565C0,stroke-width:2px,color:#0D47A1
classDef serviceTask fill:#FFF3E0,stroke:#E65100,stroke-width:2px,color:#BF360C
classDef gateway fill:#FFF9C4,stroke:#F57F17,stroke-width:2px,color:#E65100
classDef subProc fill:#F3E5F5,stroke:#7B1FA2,stroke-width:2px,color:#4A148C
subgraph lane_0["Batch User"]
n14[["fa:fa-cog Send List of WBS Elements TECO Candidates for Approval (Based on DSD)"]]
end
subgraph lane_1["CCF Analyst"]
n16["Send Error Reports via Email to CCF"]
end
subgraph lane_2["CES / Intel Products Capital Finance"]
n6["fa:fa-user Resolve WBS Element Closure Error"]
n31{{"fa:fa-code-branch exclusiveGateway"}}
end
subgraph lane_3["Capital Analyst"]
n1["Close PPM item (PS/PPM autosync function)"]
n4["fa:fa-user Run Automatic WBS Element Close Program (via Batch Job)"]
n5["fa:fa-user Approve WBS Elements for Closed Status"]
n9[["fa:fa-cog Update WBS System Status to TECO Based on Approval"]]
n10[["fa:fa-cog Update WBS System Status To TECO Based on Project Definition Finish Date"]]
n11[["fa:fa-cog Close Individual WBS Elements (L1/L2) X Days After Last TECO Date"]]
n12[["fa:fa-cog Close the Project Definition"]]
n13[["fa:fa-cog Send List of Potential WBS Elements to be Closed for Approval (Based on X..."]]
n20(["fa:fa-stop Email notification sent to Requestor/CES team"])
n23{{"fa:fa-code-branch Capital Related Expense Project?"}}
n24{{"fa:fa-code-branch AUC Is Zero?"}}
n25{{"fa:fa-code-branch exclusiveGateway"}}
n26{{"fa:fa-code-branch exclusiveGateway"}}
n27{{"fa:fa-code-branch WBS Element Closed Successfully?"}}
n28{{"fa:fa-code-branch All Individual WBS Elements Closed?"}}
n29{{"fa:fa-code-branch exclusiveGateway"}}
n32[["fa:fa-folder-open Perform Implementation Audit"]]
n33[["fa:fa-folder-open A Run Project Settlement"]]
end
subgraph lane_4["Capital Enterprise Solutions (CES) Analyst"]
n15["Send Error Reports via Email to Capital Analyst"]
n30{{"fa:fa-code-branch Budget Remaining on Level 1?"}}
end
subgraph lane_5["Capital Finance Analyst"]
n7["fa:fa-user Approve WBS Elements for TECO"]
end
subgraph lane_6["Finance Analyst"]
n2["fa:fa-user Set User Status to CNLD and System Status to TECO"]
n3["fa:fa-user Set System Status of Project to CLSD"]
n8[["fa:fa-cog Set Portfolio Item Status to CLSD"]]
n17["Obtain Approval from Project Manager to Close Project"]
n18["Identify Project for Deactivation"]
n19(["fa:fa-stop Project closed"])
n21["Perform Implementation Audit"]
n22{{"fa:fa-code-branch CAPEX or OPEX?"}}
end
n2 --> n3
n21 --> n22
n17 --> n2
n8 --> n19
n22 -->|"OPEX"| n18
n3 --> n8
n18 --> n17
n4 --> n24
n32 --> n23
n25 --> n32
n23 -->|"Yes"| n10
n24 -->|"No"| n25
n26 --> n13
n11 --> n27
n27 -->|"Yes"| n28
n27 -->|"No"| n30
n30 -->|"No"| n15
n15 --> n31
n16 --> n31
n31 --> n6
n28 -->|"No"| n26
n6 --> n26
n24 -->|"Yes"| n29
n33 --> n4
n10 --> n29
n30 -->|"Yes"| n16
n28 -->|"Yes"| n12
n22 -->|"CAPEX"| n25
n29 --> n26
n9 --> n33
n23 -->|"No"| n14
n14 --> n7
n7 --> n9
n13 --> n5
n5 --> n11
n1 --> n20
n12 --> n1
class n2 userTask
class n3 userTask
class n4 userTask
class n5 userTask
class n6 userTask
class n7 userTask
class n8 serviceTask
class n9 serviceTask
class n10 serviceTask
class n11 serviceTask
class n12 serviceTask
class n13 serviceTask
class n14 serviceTask
class n19 endEvt
class n20 endEvt
class n21 startEvt
class n22 gateway
class n23 gateway
class n24 gateway
class n25 gateway
class n26 gateway
class n27 gateway
class n28 gateway
class n29 gateway
class n30 gateway
class n31 gateway
class n32 subProc
class n33 subProc
Legend: ● Start · ● End · User Task · Service Task · ◇ Gateway · Sub-Process
%%{init: {'theme': 'base', 'themeVariables': {'fontSize': '14px', 'fontFamily': 'Segoe UI, Arial, sans-serif','primaryColor': '#e8f0fe', 'primaryBorderColor': '#0071c5','lineColor': '#37474F', 'secondaryColor': '#f5f8fc'}, 'flowchart': {'useMaxWidth': false, 'htmlLabels': true, 'curve': 'basis', 'nodeSpacing': 40, 'rankSpacing': 50}} }%%
flowchart TD
classDef startEvt fill:#4CAF50,stroke:#2E7D32,color:#000,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef endEvt fill:#C62828,stroke:#B71C1C,color:#fff,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef userTask fill:#E3F2FD,stroke:#1565C0,stroke-width:2px,color:#0D47A1
classDef serviceTask fill:#FFF3E0,stroke:#E65100,stroke-width:2px,color:#BF360C
classDef gateway fill:#FFF9C4,stroke:#F57F17,stroke-width:2px,color:#E65100
classDef subProc fill:#F3E5F5,stroke:#7B1FA2,stroke-width:2px,color:#4A148C
subgraph lane_0["BU Analyst"]
n1["fa:fa-user Perform Provision of Capital Expense Planning Template to Enter CAPEX Plan"]
n2["fa:fa-user Adjust Forecast and Categorize into TPF (Auth, Commits, Spends, OCOS)"]
n3["fa:fa-user Estimate Total Planned Project Costs before Quarterly CPA Submission"]
n16[["fa:fa-cog Load tool Level/Project Level Forecasted Spends"]]
n17[["fa:fa-cog Pull in Historical Spends Data to Inform Spending Trend"]]
n18[["fa:fa-cog Pull in Actuals Spend Data from S4"]]
n22(["fa:fa-play Determine Total Planned Project Costs Initiated"])
n24{{"fa:fa-code-branch CAPEX or OPEX?"}}
end
subgraph lane_1["Corp. FP&A Analyst"]
n4["fa:fa-user Ensure the IF MD and Investment Type Percentage are Correct"]
n5["fa:fa-user Ensure the Drivers for Non-project Related Expenses are Available"]
n6["fa:fa-user Capture the Total Non-project Related Spends by Cost Center"]
n7["fa:fa-user Capture the Total Project Related Spends by WBS and Partner Cost Center"]
n8["fa:fa-user Disaggregate to OCOS Subtype Either Equal Distribution or based on..."]
n9["fa:fa-user Make any Adjustments or Judgements if Required"]
n10["fa:fa-user Transform the Pre-Allocated Data to Post Allocated by LOB PF by PBA Logic"]
n11["fa:fa-user Pivot the Total Project Forecasted Spend and See Drill Down by CCRU,..."]
n12["fa:fa-user --160 Ensure the IP MD and Investment Type Percentage are Correct"]
n13["fa:fa-user Capture the Total Project Related Spends by WBS and Partner Cost Center"]
n14["fa:fa-user Make any Adjustments or Judgements if required"]
n15["fa:fa-user Pivot the total Project Forecasted spend and See Drill Down by CCRU,..."]
n19[["fa:fa-cog Calculate the RND and OCOS Spending Based on Flip Dates or Percentage"]]
n20[["fa:fa-cog Calculate the RND and OCOS Spending Based on Flip Dates or Percentage"]]
n21[["fa:fa-cog Transform the Pre-allocated Data to Post Allocated by LOB PF by PBA logic"]]
n23(["fa:fa-stop Determine Total Planned Project Costs Completed"])
n25{{"fa:fa-code-branch IP or IF?"}}
n26{{"fa:fa-code-branch exclusiveGateway"}}
end
n22 --> n24
n24 -->|"CAPEX"| n1
n1 --> n16
n16 --> n17
n17 --> n18
n18 --> n2
n2 --> n3
n24 -->|"OPEX"| n25
n25 -->|"IF"| n4
n4 --> n5
n5 --> n6
n6 --> n7
n7 --> n19
n19 --> n8
n8 --> n9
n9 --> n10
n10 --> n11
n25 -->|"IP"| n12
n12 --> n13
n13 --> n20
n20 --> n14
n14 --> n21
n21 --> n15
n11 --> n26
n26 --> n23
n3 --> n26
n15 --> n26
class n1 userTask
class n2 userTask
class n3 userTask
class n4 userTask
class n5 userTask
class n6 userTask
class n7 userTask
class n8 userTask
class n9 userTask
class n10 userTask
class n11 userTask
class n12 userTask
class n13 userTask
class n14 userTask
class n15 userTask
class n16 serviceTask
class n17 serviceTask
class n18 serviceTask
class n19 serviceTask
class n20 serviceTask
class n21 serviceTask
class n22 startEvt
class n23 endEvt
class n24 gateway
class n25 gateway
class n26 gateway
Legend: ● Start · ● End · User Task · Service Task · ◇ Gateway · Sub-Process
%%{init: {'theme': 'base', 'themeVariables': {'fontSize': '14px', 'fontFamily': 'Segoe UI, Arial, sans-serif','primaryColor': '#e8f0fe', 'primaryBorderColor': '#0071c5','lineColor': '#37474F', 'secondaryColor': '#f5f8fc'}, 'flowchart': {'useMaxWidth': false, 'htmlLabels': true, 'curve': 'basis', 'nodeSpacing': 40, 'rankSpacing': 50}} }%%
flowchart TD
classDef startEvt fill:#4CAF50,stroke:#2E7D32,color:#000,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef endEvt fill:#C62828,stroke:#B71C1C,color:#fff,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef userTask fill:#E3F2FD,stroke:#1565C0,stroke-width:2px,color:#0D47A1
classDef serviceTask fill:#FFF3E0,stroke:#E65100,stroke-width:2px,color:#BF360C
classDef gateway fill:#FFF9C4,stroke:#F57F17,stroke-width:2px,color:#E65100
classDef subProc fill:#F3E5F5,stroke:#7B1FA2,stroke-width:2px,color:#4A148C
subgraph lane_0["BU Analyst"]
n1["fa:fa-user Adjust Forecast and Categorize into Auth, Commits, Spends, OCOS"]
n2["fa:fa-user Capture Variance Explanation"]
n3["fa:fa-user Review CAPEX Plan with Leadership"]
n4["fa:fa-user Transfer to Capital Target at Cube level"]
n5["fa:fa-user Make finalized forecast to Central Finance"]
n13[["fa:fa-cog Load Baseline Data from S/4 at Tool Level or Project Level and Forecast Spends"]]
n14[["fa:fa-cog Load Baseline Data from ECA at Tool Level or Project Level and Forecast Spends"]]
n19(["fa:fa-play Load Project Plan Initiated"])
n20(["fa:fa-stop Load Project Plan Completed"])
n23{{"fa:fa-code-branch CAPEX or OPEX?"}}
n24{{"fa:fa-code-branch exclusiveGateway"}}
n25{{"fa:fa-code-branch Approved?"}}
n29{{"fa:fa-arrows-alt parallelGateway"}}
n30{{"fa:fa-arrows-alt parallelGateway"}}
end
subgraph lane_1["Corp. FP&A Analyst"]
n6["fa:fa-user Capture the Project Plan Assumptions for IF"]
n7["fa:fa-user Capture the Project Plan Assumptions for IP"]
n8["fa:fa-user Ensure Burden Rates are Updated"]
n9["fa:fa-user Size the Project Plan According to the Assumptions for Products"]
n10["fa:fa-user Size the Project Plan According to the Assumptions for Non -Products"]
n11["fa:fa-user Update the Project Plan – HC and GSD spend Based on PLC Milestone by Project..."]
n12["fa:fa-user Add to Collections"]
n15[["fa:fa-cog Load WBS/Project MD Hierarchy and Cost Center MD Hierarchy from MDG into SAC"]]
n16[["fa:fa-cog Load WBS/Project MD Hierarchy and Cost Center MD Hierarchy from MDG into SAC"]]
n17[["fa:fa-cog Ensure the IF Related 3 Years Actuals are Available"]]
n18[["fa:fa-cog Ensure the IP Related Years Years Actuals are Available"]]
n21(["fa:fa-stop Added to Collections"])
n22(["fa:fa-stop Project Plan Rejected"])
n26{{"fa:fa-code-branch IP or IF?"}}
n27{{"fa:fa-code-branch exclusiveGateway"}}
n28{{"fa:fa-code-branch Approved?"}}
n31{{"fa:fa-arrows-alt parallelGateway"}}
n32{{"fa:fa-arrows-alt parallelGateway"}}
end
n19 --> n23
n24 --> n1
n1 --> n2
n2 --> n5
n3 --> n25
n25 -->|"Yes"| n4
n4 --> n20
n25 -->|"No"| n24
n23 -->|"OPEX"| n26
n26 -->|"IF"| n15
n26 -->|"IP"| n16
n15 --> n6
n16 --> n7
n6 --> n17
n7 --> n18
n18 --> n27
n27 --> n8
n17 --> n27
n8 --> n31
n31 --> n9
n31 --> n10
n9 --> n32
n10 --> n32
n32 --> n11
n11 --> n28
n12 --> n21
n28 -->|"No"| n22
n28 -->|"Yes"| n12
n29 --> n13
n23 -->|"CAPEX"| n29
n29 --> n14
n13 --> n30
n14 --> n30
n30 --> n24
n5 --> n3
class n1 userTask
class n2 userTask
class n3 userTask
class n4 userTask
class n5 userTask
class n6 userTask
class n7 userTask
class n8 userTask
class n9 userTask
class n10 userTask
class n11 userTask
class n12 userTask
class n13 serviceTask
class n14 serviceTask
class n15 serviceTask
class n16 serviceTask
class n17 serviceTask
class n18 serviceTask
class n19 startEvt
class n20 endEvt
class n21 endEvt
class n22 endEvt
class n23 gateway
class n24 gateway
class n25 gateway
class n26 gateway
class n27 gateway
class n28 gateway
class n29 gateway
class n30 gateway
class n31 gateway
class n32 gateway
Legend: ● Start · ● End · User Task · Service Task · ◇ Gateway · Sub-Process
%%{init: {'theme': 'base', 'themeVariables': {'fontSize': '14px', 'fontFamily': 'Segoe UI, Arial, sans-serif','primaryColor': '#e8f0fe', 'primaryBorderColor': '#0071c5','lineColor': '#37474F', 'secondaryColor': '#f5f8fc'}, 'flowchart': {'useMaxWidth': false, 'htmlLabels': true, 'curve': 'basis', 'nodeSpacing': 40, 'rankSpacing': 50}} }%%
flowchart LR
classDef startEvt fill:#4CAF50,stroke:#2E7D32,color:#000,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef endEvt fill:#C62828,stroke:#B71C1C,color:#fff,font-weight:bold,stroke-width:2px,rx:20,ry:20
classDef userTask fill:#E3F2FD,stroke:#1565C0,stroke-width:2px,color:#0D47A1
classDef serviceTask fill:#FFF3E0,stroke:#E65100,stroke-width:2px,color:#BF360C
classDef gateway fill:#FFF9C4,stroke:#F57F17,stroke-width:2px,color:#E65100
classDef subProc fill:#F3E5F5,stroke:#7B1FA2,stroke-width:2px,color:#4A148C
subgraph lane_0["Analyst"]
n1["fa:fa-user Access Existing Plan Data"]
n2["fa:fa-user Copy Exiting Plan Data"]
n3["fa:fa-user Create an Empty Version"]
n4["fa:fa-user Copy Only the Data that is Visible Based on the Current Story and Page Filters"]
n5["fa:fa-user Change the Filter Values for the New Version"]
n6["fa:fa-user Hard Lock the Forecasted Data and Create a Public Version"]
n7["fa:fa-user Soft Lock the Forecasted Data and Create a Private/shared Version"]
n12(["fa:fa-play Copy Plan Version Initiated"])
n13(["fa:fa-stop Copy Plan Version Completed"])
n15{{"fa:fa-code-branch Hard Lock Creation Required?"}}
n16{{"fa:fa-code-branch CAPEX or OPEX?"}}
n17{{"fa:fa-code-branch Unlock and Edit Required?"}}
n18{{"fa:fa-code-branch exclusiveGateway"}}
n19{{"fa:fa-code-branch exclusiveGateway"}}
end
subgraph lane_1["Corp. FP&A Analyst"]
n8["fa:fa-user Add the Initial Project Plan as per PLC Material Requirements and Headcount..."]
n9["fa:fa-user Update the Required Comments"]
n10["fa:fa-user Identify Deltas through Actuals vs POR Forecast Spend and HC Comparison"]
n11["fa:fa-user Update the Status Field for WIP or Approved or Archived"]
n14(["fa:fa-stop Copy Plan Version Completed"])
n20{{"fa:fa-code-branch exclusiveGateway"}}
n21{{"fa:fa-code-branch Approved?"}}
end
n12 --> n16
n1 --> n2
n2 --> n3
n3 --> n4
n4 --> n5
n5 --> n19
n15 -->|"Yes"| n6
n16 -->|"CAPEX"| n1
n7 --> n17
n15 -->|"No"| n7
n6 --> n18
n18 --> n13
n19 --> n15
n17 -->|"Yes"| n19
n17 -->|"No"| n18
n20 --> n8
n8 --> n9
n9 --> n10
n10 --> n11
n11 --> n21
n21 -->|"No"| n20
n21 -->|"Yes"| n14
n16 -->|"OPEX"| n20
class n1 userTask
class n2 userTask
class n3 userTask
class n4 userTask
class n5 userTask
class n6 userTask
class n7 userTask
class n8 userTask
class n9 userTask
class n10 userTask
class n11 userTask
class n12 startEvt
class n13 endEvt
class n14 endEvt
class n15 gateway
class n16 gateway
class n17 gateway
class n18 gateway
class n19 gateway
class n20 gateway
class n21 gateway
Process readiness for DC-050 — Project Accounting with automated risk flags from Config Tracker, User Story Tracker, RICEFW Object Tracker, ECA Object Tracker.
L2
Description
L3 In-Scope
Config
User Stories
RICEFW
ECA
Status
DC-050
Project Accounting
46/46
36% (14/39)
416F/137G/570
84/87
29/53
🟡
Risk Flags for DC-050:
- 🟡 Config Incomplete — Config at 36% (14/39)
- 🟡 ECA Incomplete — 24/53 ECA objects not complete (55%)
📄 Full Process Readiness Detail → — per-capability breakdown with config items, RICEFW objects, transport analysis, and QA verification.
For the comprehensive L1/L0 readiness rollup across all capabilities, see the L0 Tower Summary.
Data Sources: Config Tracker, User Story Tracker, S4 R3 Object Tracker, ECA R3 Object Tracker (Smartsheet exports). RICEFW and ECA objects are matched via Sub-Tower Name → L2 mapping. Generated .
4. Data Architecture (TOGAF “D”)
4.1 Data Flows — Source to Target
Data flows with DB platform details will be populated when tower architects complete the extended flow template columns (42-47) via the Input Portal.
4.2 Data Flow Diagrams
DATA ARCHITECTURE — Database-to-database data flows. Applications (blue) sit above their hosting databases (green cylinders). Thick arrows show data movement between databases.
4.3 Data Lineage
Data lineage (source schema/object → target schema/object mappings) will be populated when tower architects provide validated schema details via the Input Portal.
4.4 RICEFW Data Objects
Data-centric RICEFW objects (Reports and Conversions) from the Object Tracker:
Object ID
Type
Description
Status
Source → Target
Complexity
FPRR1211
Report
Report for searching on and viewing government contract timesheets for Intel …
10. Object Complete
03.Medium
FPRR1210
Report
Report for searching on and viewing government contract timesheet changes for…
10. Object Complete
03.Medium
FPRR0907_IP
Report
Workflow Status Report ( Order Request / Approval Request / Others )
10. Object Complete
03.Medium
FPRR0907_IF
Report
Workflow Status Report ( Order Request / Approval Request / Others )
10. Object Complete
04.Low
FPRC1565
Conversion
Convert active delegate relationships for Timesheet approval
10. Object Complete
02.High
FPRC1464_IP
Conversion
Project Actuals Conversion (Non- Intel Federal)
10. Object Complete
02.High
FPRC1464_IF
Conversion
Project Actuals Conversion (Non- Intel Federal)
10. Object Complete
02.High
FPRC1442
Conversion
Conversion of Actual Labor hours for Intel Federal Projects
10. Object Complete
02.High
FPRC1441
Conversion
Conversion of ECC project hierarchy (WBS element master data) to S/4HANA proj…
10. Object Complete
02.High
FPRC1212
Conversion
Project Actuals Conversion including Intel Federal
10. Object Complete
03.Medium
FPRC0908_IP
Conversion
Project Budget Conversion
10. Object Complete
03.Medium
FPRC0908_IF
Conversion
Project Budget Conversion
10. Object Complete
03.Medium
FPRC0174_IP
Conversion
Conversion of ECC project hierarchy (WBS element master data) to S/4HANA proj…
10. Object Complete
ECC → S4
02.High
FPRC0174_IF
Conversion
Conversion of ECC project hierarchy (WBS element master data) to S/4HANA proj…
Standard governance framework per Intel IDM 2.0 data management policies. Capability-specific governance details will be populated from the Input Portal when tower architects complete the Data Governance tab.
Concern
Approach
Data Ownership
Per-entity owners aligned to Finance Plan To Report tower organizational structure
Mobile timesheet approval for Intel Federal employees.
01. Pending Approval
01.S4
01.Very High
5.5.2 ECA Development Objects
Enterprise Cloud Analytics (ECA) platform objects (Databricks/Snowflake) — views, tables, and ETL jobs with Source or Target System = ECA:
Object ID
Type
Description
Status
Source → Target
Complexity
FPRI0981_IP
Interface
Interface of SAP PPM module to SPEED
10. Object Complete
ECA → S/4
03.Medium
FPRI0981_IF
Interface
Interface of SAP PPM module to SPEED
10. Object Complete
ECA → S/4
04.Low
FPRI0909_IP
Interface
Interface for importing the Headcount details by Person# and WBS element comb…
10. Object Complete
ECA → S/4
03.Medium
FPRI0909_IF
Interface
Interface for importing the Headcount details by Person# and WBS element comb…
10. Object Complete
ECA → S/4
04.Low
5.5.3 Interface Objects
Holistic view of all interface objects by L2 capability — includes ECA → S/4, S/4 → ECA, boundary system, and inter-platform interfaces with middleware and integration approach:
Object ID
Description
Source → Target
Middleware
Approach
Status
FPRI1670
Import Dot process/stage details from MDG into S4.
NA
10. Object Complete
FPRI1669
Import Xeus/Mars volumes from ECA into S4.
BODS
10. Object Complete
FPRI1463
Interface to upload payroll data from Workday to S/4 IP for legal entity 199 …
MULESOFT
10. Object Complete
FPRI1238
Pull Foundry WBS from HAT and create in LE 199 in IP S/4 for Foundry Employee…
Head Count Assignment Tool → S/4
BODS
10. Object Complete
FPRI0981_IP
Interface of SAP PPM module to SPEED
ECA → S/4
BODS
10. Object Complete
FPRI0981_IF
Interface of SAP PPM module to SPEED
ECA → S/4
BODS
10. Object Complete
FPRI0909_IP
Interface for importing the Headcount details by Person# and WBS element comb…
ECA → S/4
BODS
10. Object Complete
FPRI0909_IF
Interface for importing the Headcount details by Person# and WBS element comb…
ECA → S/4
BODS
10. Object Complete
FPRI0188
Inbound Interface from EMS to S/4 to create WBS element and Update WBS elemen…
XEUS → S/4
APIGEE
10. Object Complete
5.5.5 Scheduling & Batch Objects
This section provides a holistic view of all batch processing and job scheduling — both internal SAP background jobs (SM37) and external orchestration (AutoSys, CWA).
5.5.5b External Scheduling Objects
External scheduling data is not yet available. Pending either AutoSys API access or a JIL export to the External Job Scheduling Tracker.
Scheduling and batch job data will be auto-populated once SAP background job extraction (TBTCO/TBTCP via ADT) is run against the development systems and AutoSys metadata is available. Run python scripts/fetch_sap_background_jobs.py to extract SAP internal jobs.
5.5.6 Boundary Application Dependencies
The following development objects integrate with boundary applications (external systems outside the S/4 HANA core):
Object ID
Description
Boundary Application
Source → Target
FPRI1463
Interface to upload payroll data from Workday to S/4 IP for legal entity 199 …
Workday
FPRI1238
Pull Foundry WBS from HAT and create in LE 199 in IP S/4 for Foundry Employee…
Head Count Assignment Tool
Head Count Assignment Tool → S/4
FPRI0981_IP
Interface of SAP PPM module to SPEED
SPEED
ECA → S/4
FPRI0981_IF
Interface of SAP PPM module to SPEED
SPEED
ECA → S/4
FPRI0909_IP
Interface for importing the Headcount details by Person# and WBS element comb…
Head Count Assignment Tool
ECA → S/4
FPRI0909_IF
Interface for importing the Headcount details by Person# and WBS element comb…
Head Count Assignment Tool
ECA → S/4
FPRI0188
Inbound Interface from EMS to S/4 to create WBS element and Update WBS elemen…
Equipment Management System
XEUS → S/4
FPRC0174_IP
Conversion of ECC project hierarchy (WBS element master data) to S/4HANA proj…
ECC
ECC → S4
FPRC0174_IF
Conversion of ECC project hierarchy (WBS element master data) to S/4HANA proj…
ECC
ECC → S4
5.6 Integration Patterns
Integration patterns will be populated when tower architects provide validated middleware and protocol details via the extended flow template.
Platform inventory will be populated when tower architects provide validated technology platform details via the extended flow template.
6.2 SAP Development Object Status
Metric
DEV
QAS
PRD
Transport Requests
—
—
—
Custom Code Objects
—
—
—
CDS Views
—
—
—
Fiori Apps
—
—
—
BAdIs / Enhancements
—
—
—
6.3 NFRs & Design Principles
Category
Requirement
Target / SLA
Priority
Performance
Month-end batch costing/closing completes within SLA window
< 4 hours end-to-end batch window
High
Availability
S/4 HANA finance modules available during business hours
99.9% (Mon-Fri 06:00-22:00 PST)
High
Scalability
Support 2x transaction volume growth over 3-year horizon
Handle 500K+ journal entries/day
Medium
Recoverability
RPO/RTO for financial systems meets audit requirements
RPO < 1 hour, RTO < 4 hours
High
Data Volume
Support growing data volumes from legacy migration + BAU
50M+ records in material ledger
Medium
Latency
Near-real-time posting for financial transactions
< 5 seconds for online postings
Medium
Concurrency
Support concurrent month-end users across time zones
200+ concurrent finance users
Medium
6.4 Security & Governance
Concern
Approach
Standard / Policy
Owner
Authentication
Single Sign-On (SSO) via Intel corporate Azure AD identity
Intel IT Security Policy - Identity Management
IT Security
Authorization
Role-based access control (RBAC) with SAP authorization objects
Intel SAP Security Standards - Role Design
SAP Security Team
Data Classification
All financial/operational data classified per Intel Data Classification Standard
Intel Data Classification Policy
Data Governance
Data Encryption (at rest)
AES-256 encryption for SAP HANA database and file storage
Intel Encryption Standard
Infrastructure Security
Data Encryption (in transit)
TLS 1.3 for all system-to-system and user-to-system communication
Intel Network Security Policy
Network Engineering
Network Segmentation
SAP systems in dedicated network zones with firewall controls
Intel Network Architecture Standard
Network Security
API Security
OAuth 2.0 / certificate-based authentication for all API integrations
Intel API Security Guidelines
Integration Architecture
Audit Logging
Comprehensive audit trail for all data changes and user actions (SAP Security Audit Log)
SOX Compliance / Intel Audit Policy
Internal Audit
Certificate Management
Automated certificate lifecycle management for system-to-system trust
Intel PKI Standard
Certificate Authority Team
Compliance
SOX controls, export control (EAR/ITAR) screening, data privacy (GDPR)
Intel Corporate Compliance Framework
Compliance Office
6.5 ECA Development Object Status
Metric
Count
ECA Objects (active)
53
ECA Complete
29 (55%)
ECA In Progress
24
ECA Rejected/Cancelled
46
ECA Objects (from S4 tracker)
4
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Objects matched via Sub-Tower Name → L2 capability mapping. Rejected/cancelled/on-hold objects excluded from active counts.
7. Project Context
7.1 Project Roadmap & Go-Live Plan
ID
Description
FS
TDD
Build
FUT
Status
FPRW1064_IP
Custom Workflow will also be created with some predefined process/rules for a…
2025-03-21 00:00:00 (100%)
2025-11-21 00:00:00 (100%)
2025-11-21 00:00:00 (100%)
2026-02-04 00:00:00 (100%)
1. On Track
FPRW1064_IF
Custom Workflow will also be created with some predefined process/rules for a…
2025-03-21 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
2026-02-04 00:00:00 (100%)
1. On Track
FPRW0906_IP
Custom workflow: Change Order Create and Change Approval
2025-03-21 00:00:00 (100%)
2025-11-21 00:00:00 (100%)
2025-11-21 00:00:00 (100%)
2026-03-12 00:00:00 (100%)
1. On Track
FPRW0906_IF
Custom workflow: Change Order Create and Change Approval
2025-03-21 00:00:00 (100%)
2025-11-21 00:00:00 (100%)
2025-11-21 00:00:00 (100%)
2026-03-12 00:00:00 (100%)
1. On Track
FPRW0904_IP
Custom Workflow - WBS Element Request approval with WBS Element creation
2025-03-21 00:00:00 (100%)
2025-10-03 00:00:00 (100%)
2025-10-03 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
1. On Track
FPRW0904_IF
Custom Workflow - WBS Element Request approval with WBS Element creation
2025-03-21 00:00:00 (100%)
2025-10-03 00:00:00 (100%)
2025-10-03 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
1. On Track
FPRW0900_IP
Custom Workflow: Approval for Project creation and create a Project def and l…
2025-02-21 00:00:00 (100%)
2025-09-05 00:00:00 (100%)
2025-09-05 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
3. Off Track
FPRW0900_IF
Custom Workflow: Approval for Project creation and create a Project def and l…
2025-02-21 00:00:00 (100%)
2025-09-05 00:00:00 (100%)
2025-09-05 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
1. On Track
FPRW0445_IP
Project budget approval workflow (Capex)
2024-08-23 00:00:00 (100%)
2025-08-29 00:00:00 (100%)
2025-08-29 00:00:00 (100%)
2025-09-10 00:00:00 (100%)
1. On Track
FPRW0445_IF
Project budget approval workflow (Capex)
2024-08-23 00:00:00 (100%)
2025-08-29 00:00:00 (100%)
2025-08-29 00:00:00 (100%)
2025-09-10 00:00:00 (100%)
1. On Track
FPRR1211
Report for searching on and viewing government contract timesheets for Intel …
2025-04-18 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
2025-12-03 00:00:00 (100%)
1. On Track
FPRR1210
Report for searching on and viewing government contract timesheet changes for…
2025-04-18 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
2026-02-04 00:00:00 (100%)
4. Completed
FPRR0907_IP
Workflow Status Report ( Order Request / Approval Request / Others )
2025-03-21 00:00:00 (100%)
2025-08-13 00:00:00 (100%)
2025-08-13 00:00:00 (100%)
2025-10-01 00:00:00 (100%)
2. At Risk
FPRR0907_IF
Workflow Status Report ( Order Request / Approval Request / Others )
2025-03-21 00:00:00 (100%)
2025-08-13 00:00:00 (100%)
2025-08-13 00:00:00 (100%)
2025-10-01 00:00:00 (100%)
1. On Track
FPRI1670
Import Dot process/stage details from MDG into S4.
2025-12-03 00:00:00 (100%)
2026-01-16 00:00:00 (100%)
2026-01-16 00:00:00 (100%)
2026-02-04 00:00:00 (100%)
3. Off Track
FPRI1669
Import Xeus/Mars volumes from ECA into S4.
2025-12-03 00:00:00 (100%)
2026-02-04 00:00:00 (100%)
2026-02-04 00:00:00 (100%)
2026-03-27 00:00:00 (100%)
3. Off Track
FPRI1463
Interface to upload payroll data from Workday to S/4 IP for legal entity 199 …
2025-07-16 00:00:00 (100%)
2025-09-05 00:00:00 (100%)
2025-09-05 00:00:00 (100%)
2025-11-05 00:00:00 (100%)
1. On Track
FPRI1238
Pull Foundry WBS from HAT and create in LE 199 in IP S/4 for Foundry Employee…
2025-03-21 00:00:00 (100%)
2025-04-23 00:00:00 (100%)
2025-04-23 00:00:00 (100%)
2025-08-13 00:00:00 (100%)
FPRI0981_IP
Interface of SAP PPM module to SPEED
2025-02-21 00:00:00 (100%)
2025-04-04 00:00:00 (100%)
2025-04-04 00:00:00 (100%)
2025-09-10 00:00:00 (100%)
FPRI0981_IF
Interface of SAP PPM module to SPEED
2025-02-21 00:00:00 (100%)
2025-04-02 00:00:00 (100%)
2025-04-02 00:00:00 (100%)
2025-09-10 00:00:00 (100%)
… and 67 more objects (see full Object Tracker)
7.2 RAID Log
RAID items will be auto-populated from the Smartsheet RAID log when matched to this capability.
7.3 Recommendations & Next Steps
#
Category
Recommendation
Priority
Owner
Target Date
Status
1
Architecture
Complete extended flow attributes (Data Entity, Integration Pattern, Tech Platform) in Flows tab for full BDAT coverage
High
Tower Architect
2026-Q2
Open
2
Data
Define data ownership and classification for all 0 flow chains to satisfy Data Architecture (TOGAF D) requirements
Medium
Data Architect
2026-Q3
Open
3
Testing
Develop integration test scenarios covering all 0 flow chains for FUT/SIT readiness
High
Test Lead
2026-Q3
Open
4
Business Architecture
Review and validate Business Architecture process steps against latest Signavio/BIC process models
Medium
Business Analyst
2026-Q2
Open
5
Security
Complete security review for API integrations and data flows per Intel Security Architecture standards
Medium
Security Architect
2026-Q3
Open
DC-050 — Architecture Document (TOGAF BDAT) · Finance Plan To Report · Generated: May 2026