BR-170 — Manage Chargebacks (IP)

Testing & Quality Report

Order to Cash — Intel Products (OTC-IP) Tower
Capability BR-170 · BR Billing and Rebates (IP)

IAO Program · R1 – R5
Generated: April 2026
Sajiv Francis

IAO Architecture Pipeline — Intel Confidential

Table of Contents

1. Executive Summary

This report provides the testing and quality status for Order to Cash — Intel Products (OTC-IP) — BR-170 Manage Chargebacks (IP) sourced from JIRA (cached April 2026).

Metric Value
Total RICEFW Objects 292
Objects with Test Coverage 292 (100%)
Test Cases 0
Pass Rate 0%
Open Defects 0
Critical Defects 0
FUT Avg Completion 100%
Build Avg Completion 99%

2. Test Coverage

2.1 Coverage by RICEFW Type

RICEFW Type Total Objects FUT Started FUT % Avg Build % Avg
Interface 71 71 100% 100%
Conversion 20 20 100% 85%
Enhancement 167 167 100% 100%
Report 5 5 100% 99%
Form 28 28 100% 100%
Workflow 1 1 100% 100%
Total 292 292 100% 99%

2.2 Test Case Summary

Status Count %
Passed 0 0%
Failed 0 0%
Blocked 0 0%
Not Run 0 0%
Total 0 100%

3. Test Execution Status

3.1 Functional Unit Testing (FUT)

Object ID Type Description FUT % FUT Status Build %
OTCE0719 E Utility program for open sales order … 99% In Progress 96%
LOGR1236 R 2DN - Outbound Escort Report 100% Complete 95%

3.2 Integration Testing

Test Scenario Status Related RICEFW Defects

3.3 User Acceptance Testing (UAT)

Test Scenario Status Sign-off Business Owner

4. Defect Analysis

4.1 Defects by Severity

Severity Open In Progress Resolved Total
High 0 0 12 12
Medium 0 0 2 2
Total 0 0 14 14

4.2 Defect Aging

Age Bucket Critical High Medium Low
0–7 days 0 0 0 0
8–14 days 0 0 0 0
15–30 days 0 0 0 0
31–60 days 0 0 0 0
60+ days 0 0 0 0

4.3 Open Defects

Defect ID Severity Summary Status Assignee Days Open

5. Sprint Status

Sprint Start End Committed Completed Velocity

6. Go-Live Readiness

Criterion Status Evidence
All critical defects resolved ✅ Pass JIRA defect query
Test pass rate ≥ 95% ⚠️ 0% JIRA test execution
UAT sign-off obtained ⏳ Pending JIRA UAT board
No P0/P1 blockers open ✅ Clear JIRA issue tracker

Generated by IAO Architecture Pipeline · April 2026 · Intel Confidential