🏠 Home FPR Tower RICEFW Tracker
🤖 IAO Architecture Assistant AI-Powered
Welcome! I can answer questions about RICEFW objects, build readiness, architecture patterns, and towers across the IAO IDM 2.0 program. What would you like to know?
Phase 1 · GitHub Actions backend · ~30-60s response time
IAO Architecture

DS-020 — Perform Product Costing and Inventory Valuation

RICEFW Object Tracker

Finance Plan to Report (FPR) Tower
Capability DS-020 · DS Provide Decision Support

IAO Program · R1 – R5
Generated: April 2026
Sajiv Francis

IAO Architecture Pipeline — Intel Confidential

Table of Contents

1. Executive Summary

This tracker provides the RICEFW object inventory and build progress for Finance Plan to Report (FPR) — DS-020 Perform Product Costing and Inventory Valuation.

Metric Value
Total RICEFW Objects 367
Active (In Progress) 7
Completed 355
Rejected / Cancelled 5
Breakdown 86 Interfaces, 25 Conversions, 220 Enhancements, 17 Reports, 1 Forms, 18 Workflows
Avg FS Completion 99%
Avg Build Completion 98%
Avg FUT Completion 98%

2. RICEFW Inventory

2.1 Summary by Type

Type Code Count % of Total
Interface I 86 23%
Conversion C 25 7%
Enhancement E 220 60%
Report R 17 5%
Form F 1 0%
Workflow W 18 5%
Total 367 100%

2.2 Summary by Status

Status Count % of Total
Completed 355 97%
Rejected / Cancelled 5 1%
09. FUT Overdue 4 1%
06. Dev In Progress 2 1%
01. Pending Approval 1 0%

3. Detailed Object Listing

3.1 Interfaces

No interface objects for this capability.

3.2 Conversions

Object ID Description Status Source → Target Middleware Complexity Build %
FPRC1724_IP Creation of output template with consumption data 06. Dev In Progress NA 02.High 0.92
FPRC1724_IF Creation of output template with consumption data 06. Dev In Progress NA 03.Medium 0.92
### 3.3 Enhancements
Object ID Description Status Source → Target Middleware Complexity Build %
FPRE1661_IF WBS transfer tool 09. FUT Overdue NA 03.Medium 1.0
FPRE1599_IP Update existing custom table ZTFPR_ACRENG02 to store the calculation of PO li… 09. FUT Overdue NA 03.Medium 1.0
FPRE1599_IF Update existing custom table ZTFPR_ACRENG02 to store the calculation of PO li… 09. FUT Overdue NA 04.Low 1.0
FPRE0880 Cash concentration functionality for cross-currency current accounts 09. FUT Overdue NA 04.Low 1.0
FPRE1741 Mobile timesheet approval for Intel Federal employees. 01. Pending Approval NA 01.Very High 0.0
### 3.4 Reports

No report objects for this capability.

3.5 Forms

No form objects for this capability.

3.6 Workflows

No workflow objects for this capability.

4. Build Progress

4.1 Phase Completion

Object ID Description FS TDD Build FUT Status
FPRE1661_IF WBS transfer tool 2026-01-07 00:00:00 (100%) 2026-02-04 00:00:00 (100%) 2026-02-04 00:00:00 (100%) 2026-03-20 00:00:00 (95%) 3. Off Track
FPRE1599_IP Update existing custom table ZTFPR_AC… 2025-09-10 00:00:00 (100%) 2025-11-21 00:00:00 (100%) 2025-11-21 00:00:00 (100%) 2026-03-27 00:00:00 (55%) 3. Off Track
FPRE1599_IF Update existing custom table ZTFPR_AC… 2025-09-10 00:00:00 (100%) 2025-11-21 00:00:00 (100%) 2025-11-21 00:00:00 (100%) 2026-03-27 00:00:00 (55%) 3. Off Track
FPRE0880 Cash concentration functionality for … 2025-01-24 00:00:00 (100%) 2026-01-07 00:00:00 (100%) 2026-01-07 00:00:00 (100%) 2026-03-27 00:00:00 (50%) 3. Off Track
FPRC1724_IP Creation of output template with cons… 2026-02-13 00:00:00 (100%) 2026-02-13 00:00:00 (100%) 2026-03-27 00:00:00 (92%) 2026-03-27 00:00:00 (55%) 3. Off Track
FPRC1724_IF Creation of output template with cons… 2026-02-13 00:00:00 (100%) 2026-02-13 00:00:00 (100%) 2026-03-27 00:00:00 (92%) 2026-03-27 00:00:00 (55%) 3. Off Track

4.2 Delivery Timeline

Phase On Track Off Track Not Started Avg Completion
Functional Spec 6 0 1 86%
Technical Design 6 0 1 86%
Build & TUT 6 0 1 83%
FUT 6 0 1 52%

5. Risk Items

RAID items will be populated from the Master RAID Log.


Generated by IAO Architecture Pipeline · April 2026 · Intel Confidential