Order To Cash (IP) (OTC-IP) Tower
Capability LO-180
IAO Program
Generated: May 2026
Sajiv Francis
Companion to LO-180-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| LO-180 | Manage Outbound Transportation - OTC (IP) | 2/2 | 8/8 | 54% | 65% | 100% | — | 🟢 GREEN |
LO-180 Totals: 2/2 L3 in-scope · 7/13 config complete · 36/55 Fit · 57/57 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 13 |
| Config CDD Complete | 7 |
| Average Completion | 54% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| LO-180 | Manage Outbound… | 55 | 36 | 19 | 65% | — |
LO-180: 36/55 Fit-to-Standard (65%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| LO-180 | Manage Outbound… | 57 | 57 | 0 | — |
LO-180: 57/57 complete (100%)
All automated risk flags detected across data sources.
✅ No risk flags detected for LO-180.