  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
R-200 Receive Materials and Services (IF) 0/2 0/27 0% 100% 100% 67% 🔴 RED

R-200 Totals: 0/2 L3 in-scope · 0/2 config complete · 2/2 Fit · 5/5 RICEFW complete · 2/3 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

R-200 — Receive Materials and Services (IF)

Metric Value
Config Items Required 2
Config CDD Complete 0
Average Completion 0%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
R-200 Receive Materials and Services (IF) 2 2 0 100%

R-200: 2/2 Fit-to-Standard (100%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
R-200 Receive Materials and Services (IF) 5 5 0

R-200: 5/5 complete (100%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
R-200 Receive Materials and Services (IF) 3 2 1 67% 0

R-200: 2/3 ECA complete (67%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 R-200 Config Incomplete Config at 0% (0/2) 🔴 HIGH
2 R-200 ECA Incomplete 1/3 ECA objects not complete (67%) 🟡 MEDIUM

Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW