GT-130 — Process Readiness Detail

Intrastat Filing (S4) (IF)

Order To Cash (IF) (OTC-IF) Tower
Capability GT-130

IAO Program
Generated: May 2026
Sajiv Francis

Companion to GT-130-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
GT-130 Intrastat Filing (S4) (IF) 5/5 15/15 83% 94% 100% 100% 🟢 GREEN

GT-130 Totals: 5/5 L3 in-scope · 5/6 config complete · 29/31 Fit · 3/3 RICEFW complete · 12/12 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

GT-130 — Intrastat Filing (S4) (IF)

Metric Value
Config Items Required 6
Config CDD Complete 5
Average Completion 83%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
GT-130 Intrastat Filing (S4) (IF) 31 29 2 94%

GT-130: 29/31 Fit-to-Standard (94%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
GT-130 Intrastat Filing (S4) (IF) 3 3 0

GT-130: 3/3 complete (100%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
GT-130 Intrastat Filing (S4) (IF) 12 12 0 100% 7

GT-130: 12/12 ECA complete (100%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

✅ No risk flags detected for GT-130.