Master Data (MDM) Tower
Capability MDM-140
IAO Program
Generated: May 2026
Sajiv Francis
Companion to MDM-140-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| MDM-140 | Maintain ERP Reference Data | 34/34 | 677/677 | 96% | — | 100% | — | 🟢 GREEN |
MDM-140 Totals: 34/34 L3 in-scope · 27/28 config complete · 0/0 Fit · 9/9 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 28 |
| Config CDD Complete | 27 |
| Average Completion | 96% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
MDM-140: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| MDM-140 | Maintain ERP Reference Data | 9 | 9 | 0 | — |
MDM-140: 9/9 complete (100%)
All automated risk flags detected across data sources.
✅ No risk flags detected for MDM-140.
← Back to Architecture Document
MDM-140 — Process Readiness Detail · Master Data · Generated: May 2026