Master Data (MDM) Tower
Capability MDM-130
IAO Program
Generated: May 2026
Sajiv Francis
Companion to MDM-130-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| MDM-130 | Create and Maintain Customers | 0/107 | 0/1743 | 29% | — | 100% | — | 🟡 AMBER |
MDM-130 Totals: 0/107 L3 in-scope · 5/17 config complete · 0/0 Fit · 26/26 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 17 |
| Config CDD Complete | 5 |
| Average Completion | 29% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
MDM-130: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| MDM-130 | Create and Maintain Customers | 26 | 26 | 0 | — |
MDM-130: 26/26 complete (100%)
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | MDM-130 | Config Incomplete | Config at 29% (5/17) | 🟡 MEDIUM |
Summary: 🔴 0 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
MDM-130 — Process Readiness Detail · Master Data · Generated: May 2026