Master Data (MDM) Tower
Capability MDM-020
IAO Program
Generated: May 2026
Sajiv Francis
Companion to MDM-020-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| MDM-020 | Create and Maintain Vendors | 0/30 | 0/301 | 0% | — | 100% | — | 🔴 RED |
MDM-020 Totals: 0/30 L3 in-scope · 0/15 config complete · 0/0 Fit · 8/8 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 15 |
| Config CDD Complete | 0 |
| Average Completion | 0% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
MDM-020: 0/0 Fit-to-Standard (0%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| MDM-020 | Create and Maintain Vendors | 8 | 8 | 0 | — |
MDM-020: 8/8 complete (100%)
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | MDM-020 | Config Incomplete | Config at 0% (0/15) | 🔴 HIGH |
Summary: 🔴 1 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
MDM-020 — Process Readiness Detail · Master Data · Generated: May 2026