Resolved Defects (8)

All defects with a closed/resolved status from JIRA. These are excluded from the Testing Report’s open defects section to keep that document focused on actionable items.

# Defect ID Severity Summary Status Assignee
1 IAODTM-8510 Critical Cutover File Reource Name/E-mail Changes Required Retest Benoist, Jon
2 IAODTM-8437 Critical 7B1 OSAT Text PO GR API expecting Material as input Completed M, Ramesh
3 IAODTM-8351 Critical IAO R3 - LOGI0664_IP FUT Payload Discrepancy Completed Nema, NikhilX
4 IAODTM-8262 Critical IAO R3 - LOGI0663_IP and LOGI0663_IF FUT Payload Discrepancy Completed Nema, NikhilX
5 IAODTM-8904 High FIORI app not found Completed Ravi, SuryaX
6 IAODTM-8461 High LE Merge Regression Testing 4430 - 4B2 GR OUM value issue… Retest Mnadarajan, Hisywaary
7 IAODTM-8900 Medium {FTSI1681} Manufacturing Order Line item incremented by 1… Completed Lazar, Brinda
8 IAODTM-8601 Medium Mapping Changes for FTSI0725-GR for Production Order-Trun… Completed M, Ramesh