🏠 Home FTS-IP Tower 📝 ADA Editor ↗
IAO Architecture

LO-190 — Process Readiness Detail

Ship/Deliver Orders - FTS (IP)

Forecast to Stock (IP) (FTS-IP) Tower
Capability LO-190

IAO Program
Generated: May 2026
Sajiv Francis

Companion to LO-190-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
LO-190 Ship/Deliver Orders - FTS (IP) 0/12 0/101 20% 100% 100% 🔴 RED

LO-190 Totals: 0/12 L3 in-scope · 5/25 config complete · 0/0 Fit · 17/17 RICEFW complete · 1/1 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

LO-190 — Ship/Deliver Orders - FTS (IP)

Metric Value
Config Items Required 25
Config CDD Complete 5
Average Completion 20%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW

LO-190: 0/0 Fit-to-Standard (0%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
LO-190 Ship/Deliver Orders - FTS (IP) 17 17 0

LO-190: 17/17 complete (100%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
LO-190 Ship/Deliver Orders - FTS (IP) 1 1 0 100% 0

LO-190: 1/1 ECA complete (100%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 LO-190 Config Incomplete Config at 20% (5/25) 🔴 HIGH

Summary: 🔴 1 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW


Back to Architecture Document


LO-190 — Process Readiness Detail · Forecast to Stock (IP) · Generated: May 2026