MR-020 — Process Readiness Detail

Manage Capital Structure

Finance Plan To Report (FPR) Tower
Capability MR-020

IAO Program
Generated: May 2026
Sajiv Francis

Companion to MR-020-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
MR-020 Manage Capital Structure 6/9 97/154 100% 84% 98% 73% 🟡 AMBER

MR-020 Totals: 6/9 L3 in-scope · 5/5 config complete · 58/69 Fit · 41/42 RICEFW complete · 8/11 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

MR-020 — Manage Capital Structure

Metric Value
Config Items Required 5
Config CDD Complete 5
Average Completion 100%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
MR-020 Manage Capital Structure 69 58 11 84%

MR-020: 58/69 Fit-to-Standard (84%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
MR-020 Manage Capital Structure 42 41 1

MR-020: 41/42 complete (98%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
MR-020 Manage Capital Structure 11 8 3 73% 0

MR-020: 8/11 ECA complete (73%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 MR-020 ECA Incomplete 3/11 ECA objects not complete (73%) 🟡 MEDIUM

Summary: 🔴 0 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW


Back to Architecture Document


MR-020 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026