MR-010 — Process Readiness Detail

Manage Liquidity

Finance Plan To Report (FPR) Tower
Capability MR-010

IAO Program
Generated: May 2026
Sajiv Francis

Companion to MR-010-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
MR-010 Manage Liquidity 13/18 156/194 100% 74% 98% 73% 🟡 AMBER

MR-010 Totals: 13/18 L3 in-scope · 17/17 config complete · 92/125 Fit · 41/42 RICEFW complete · 8/11 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

MR-010 — Manage Liquidity

Metric Value
Config Items Required 17
Config CDD Complete 17
Average Completion 100%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
MR-010 Manage Liquidity 125 92 33 74%

MR-010: 92/125 Fit-to-Standard (74%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
MR-010 Manage Liquidity 42 41 1

MR-010: 41/42 complete (98%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
MR-010 Manage Liquidity 11 8 3 73% 0

MR-010: 8/11 ECA complete (73%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 MR-010 ECA Incomplete 3/11 ECA objects not complete (73%) 🟡 MEDIUM

Summary: 🔴 0 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW