🏠 Home FPR Tower 📝 ADA Editor ↗
IAO Architecture

MB-070 — Process Readiness Detail

Prepare Budgets

Finance Plan To Report (FPR) Tower
Capability MB-070

IAO Program
Generated: May 2026
Sajiv Francis

Companion to MB-070-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
MB-070 Prepare Budgets 18/18 130/130 0% 78% 100% 17% 🔴 RED

MB-070 Totals: 18/18 L3 in-scope · 0/19 config complete · 87/111 Fit · 14/14 RICEFW complete · 1/6 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

MB-070 — Prepare Budgets

Metric Value
Config Items Required 19
Config CDD Complete 0
Average Completion 0%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
MB-070 Prepare Budgets 111 87 0 78%

MB-070: 87/111 Fit-to-Standard (78%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
MB-070 Prepare Budgets 14 14 0

MB-070: 14/14 complete (100%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
MB-070 Prepare Budgets 6 1 5 17% 0

MB-070: 1/6 ECA complete (17%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 MB-070 Config Incomplete Config at 0% (0/19) 🔴 HIGH
2 MB-070 ECA Incomplete 5/6 ECA objects not complete (17%) 🔴 HIGH

Summary: 🔴 2 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW


Back to Architecture Document


MB-070 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026