DS-020 — Process Readiness Detail

Perform Product Costing and Inventory Valuation

Finance Plan To Report (FPR) Tower
Capability DS-020

IAO Program
Generated: May 2026
Sajiv Francis

Companion to DS-020-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
DS-020 Perform Product Costing and Inventory Valuation 0/18 0/145 100% 77% 89% 49% 🔴 RED

DS-020 Totals: 0/18 L3 in-scope · 17/17 config complete · 222/287 Fit · 24/27 RICEFW complete · 40/82 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

DS-020 — Perform Product Costing and Inventory Valuation

Metric Value
Config Items Required 17
Config CDD Complete 17
Average Completion 100%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
DS-020 Perform Product Costing… 287 222 44 77%

DS-020: 222/287 Fit-to-Standard (77%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
DS-020 Perform Product Costing… 27 24 3

DS-020: 24/27 complete (89%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
DS-020 Perform Product Costing… 82 40 42 49% 20

DS-020: 40/82 ECA complete (49%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 DS-020 RICEFW Incomplete 3/27 objects not complete 🟡 MEDIUM
2 DS-020 ECA Incomplete 42/82 ECA objects not complete (49%) 🔴 HIGH

Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW