Finance Plan To Report (FPR) Tower
Capability DS-020
IAO Program
Generated: May 2026
Sajiv Francis
Companion to DS-020-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| DS-020 | Perform Product Costing and Inventory Valuation | 0/18 | 0/145 | 100% | 77% | 89% | 49% | 🔴 RED |
DS-020 Totals: 0/18 L3 in-scope · 17/17 config complete · 222/287 Fit · 24/27 RICEFW complete · 40/82 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 17 |
| Config CDD Complete | 17 |
| Average Completion | 100% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| DS-020 | Perform Product Costing… | 287 | 222 | 44 | 77% | — |
DS-020: 222/287 Fit-to-Standard (77%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| DS-020 | Perform Product Costing… | 27 | 24 | 3 | — |
DS-020: 24/27 complete (89%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| DS-020 | Perform Product Costing… | 82 | 40 | 42 | 49% | 20 |
DS-020: 40/82 ECA complete (49%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | DS-020 | RICEFW Incomplete | 3/27 objects not complete | 🟡 MEDIUM |
| 2 | DS-020 | ECA Incomplete | 42/82 ECA objects not complete (49%) | 🔴 HIGH |
Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
DS-020 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026