Finance Plan To Report (FPR) Tower
Capability DS-010
IAO Program
Generated: May 2026
Sajiv Francis
Companion to DS-010-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| DS-010 | Perform Overhead Accounting and Allocation | 6/6 | 26/26 | 0% | 78% | 100% | 6% | 🔴 RED |
DS-010 Totals: 6/6 L3 in-scope · 0/8 config complete · 40/51 Fit · 14/14 RICEFW complete · 1/18 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 8 |
| Config CDD Complete | 0 |
| Average Completion | 0% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| DS-010 | Perform Overhead… | 51 | 40 | 6 | 78% | — |
DS-010: 40/51 Fit-to-Standard (78%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| DS-010 | Perform Overhead… | 14 | 14 | 0 | — |
DS-010: 14/14 complete (100%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| DS-010 | Perform Overhead… | 18 | 1 | 17 | 6% | 0 |
DS-010: 1/18 ECA complete (6%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | DS-010 | Config Incomplete | Config at 0% (0/8) | 🔴 HIGH |
| 2 | DS-010 | ECA Incomplete | 17/18 ECA objects not complete (6%) | 🔴 HIGH |
Summary: 🔴 2 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
DS-010 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026