| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| DC-100 | Revenue Recognition | 5/6 | 81/88 | 86% | 72% | 100% | — | 🟢 GREEN |
DC-100 Totals: 5/6 L3 in-scope · 6/7 config complete · 28/39 Fit · 14/14 RICEFW complete · 0/0 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 7 |
| Config CDD Complete | 6 |
| Average Completion | 86% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| DC-100 | Revenue Recognition | 39 | 28 | 10 | 72% | — |
DC-100: 28/39 Fit-to-Standard (72%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| DC-100 | Revenue Recognition | 14 | 14 | 0 | — |
DC-100: 14/14 complete (100%)
All automated risk flags detected across data sources.
✅ No risk flags detected for DC-100.