DC-060 — Process Readiness Detail

Manage Taxes

Finance Plan To Report (FPR) Tower
Capability DC-060

IAO Program
Generated: May 2026
Sajiv Francis

Companion to DC-060-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
DC-060 Manage Taxes 110/153 1242/1732 39% 81% 95% 76% 🟡 AMBER

DC-060 Totals: 110/153 L3 in-scope · 12/31 config complete · 736/908 Fit · 19/20 RICEFW complete · 26/34 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

DC-060 — Manage Taxes

Metric Value
Config Items Required 31
Config CDD Complete 12
Average Completion 39%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
DC-060 Manage Taxes 908 736 76 81%

DC-060: 736/908 Fit-to-Standard (81%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
DC-060 Manage Taxes 20 19 1

DC-060: 19/20 complete (95%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
DC-060 Manage Taxes 34 26 8 76% 14

DC-060: 26/34 ECA complete (76%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 DC-060 Config Incomplete Config at 39% (12/31) 🟡 MEDIUM
2 DC-060 ECA Incomplete 8/34 ECA objects not complete (76%) 🟡 MEDIUM

Summary: 🔴 0 HIGH · 🟡 2 MEDIUM · 🔵 0 LOW


Back to Architecture Document


DC-060 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026