Finance Plan To Report (FPR) Tower
Capability DC-060
IAO Program
Generated: May 2026
Sajiv Francis
Companion to DC-060-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| DC-060 | Manage Taxes | 110/153 | 1242/1732 | 39% | 81% | 95% | 76% | 🟡 AMBER |
DC-060 Totals: 110/153 L3 in-scope · 12/31 config complete · 736/908 Fit · 19/20 RICEFW complete · 26/34 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 31 |
| Config CDD Complete | 12 |
| Average Completion | 39% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| DC-060 | Manage Taxes | 908 | 736 | 76 | 81% | — |
DC-060: 736/908 Fit-to-Standard (81%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| DC-060 | Manage Taxes | 20 | 19 | 1 | — |
DC-060: 19/20 complete (95%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| DC-060 | Manage Taxes | 34 | 26 | 8 | 76% | 14 |
DC-060: 26/34 ECA complete (76%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | DC-060 | Config Incomplete | Config at 39% (12/31) | 🟡 MEDIUM |
| 2 | DC-060 | ECA Incomplete | 8/34 ECA objects not complete (76%) | 🟡 MEDIUM |
Summary: 🔴 0 HIGH · 🟡 2 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
DC-060 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026