This tracker provides the development object inventory and build progress for Finance Plan to Report (FPR) — DC-060 Manage Taxes.

Metric Value
Total Dev Objects 68
S/4 RICEFW Objects 20
ECA Objects 48
Active (In Progress) 8
Completed 45
Rejected / Cancelled 15
S/4 RICEFW Breakdown 2 Interfaces, 16 Enhancements, 2 Reports
ECA Breakdown 32 ECA Views, 16 3rd Party Reports
Avg FS Completion 95%
Avg Build Completion 78%
Avg FUT Completion 72%

2. Dev Object Inventory

2.1 Summary by Type

Type Code Count % of Total
Interface I 2 3%
Enhancement E 16 24%
Report R 2 3%
ECA View EV 32 47%
3rd Party Report 3P 16 24%
Total 68 100%

2.2 Summary by Status

Status Count % of Total
Completed 45 66%
Rejected / Cancelled 15 22%
09. FUT Overdue 4 6%
02. FS Unplanned 3 4%
07. FUT Not Started 1 1%

3. S/4 RICEFW Objects

3.1 Interfaces

Completed (2):

Object ID Description Source → Target Middleware Complexity
FPRI0696_IP Interface between ONESOURCE and Readsoft Process Director built on the back o… ONESOURCE → READSOFT NA 02.High
FPRI0696_IF Interface between ONESOURCE and Readsoft Process Director built on the back o… ONESOURCE → READSOFT NA 03.Medium
### 3.2 Conversions

No conversion objects for this capability.

3.3 Enhancements

Completed (15):

Object ID Description Source → Target Middleware Complexity
FPRE1723_IP Intel BRF+ - Create Function Modules in S/4HANA(FM and BRF+) NA 04.Low
FPRE1723_IF Intel BRF+ - Create Function Modules in S/4HANA(FM and BRF+) NA 04.Low
FPRE1722_IP Intel BRF+ - Create Function Modules in S/4HANA (FM and components) NA 04.Low
FPRE1722_IF Intel BRF+ - Create Function Modules in S/4HANA (FM and components) NA 04.Low
FPRE1513_IP Generate and download JV file for JE posting NA 03.Medium
FPRE1513_IF Generate and download JV file for JE posting NA 04.Low
FPRE1512_IP Query confirm ITT document to determine the Capital/Expense and tax code manu… NA 03.Medium
FPRE1512_IF Query confirm ITT document to determine the Capital/Expense and tax code manu… NA 04.Low
FPRE1511_IP Query existing draft ITT document and make changes NA 03.Medium
FPRE1511_IF Query existing draft ITT document and make changes NA 04.Low
FPRE1510_IP ITT document creation NA 03.Medium
FPRE1510_IF ITT document creation NA 04.Low
FPRE0931_IP Rebuild Boundary Application ITT in S/4 NA 03.Medium
FPRE0931_IF Rebuild Boundary Application ITT in S/4 NA 03.Medium
FPRE0931_CFIN Rebuild Boundary Application ITT in S/4 NA 02.High
### 3.4 Reports

Completed (2):

Object ID Description Source → Target Middleware Complexity
FPRR1514_IP To generate reports out of the ITT documents that was created NA 03.Medium
FPRR1514_IF To generate reports out of the ITT documents that was created NA 04.Low
### 3.5 Forms

No form objects for this capability.

3.6 Workflows

No workflow objects for this capability.

4. ECA Objects

4.1 ECA Views

Active (1):

Object ID Description Status Sub-Tower Complexity FS % TDD % Build % FUT %
FPRXV526 GLAP Detail 09. FUT Overdue 3.2 FPR - Tax 03.Medium 1.0 1.0 1.0 0.9
Completed (17):
Object ID Description Sub-Tower Complexity
FPRXV416 Universal Journal Entry Line Items 3.2 FPR - Tax 03.Medium
FPRXV417 Accounting Document Header Line 3.2 FPR - Tax 03.Medium
FPRXV418 GL Line Items 3.2 FPR - Tax 03.Medium
FPRXV419 Internal Order Plan 3.2 FPR - Tax 03.Medium
FPRXV420 Tax Account Summary Details 3.2 FPR - Tax 03.Medium
FPRXV421 Spending Analysis 3.2 FPR - Tax 03.Medium
FPRXV437 Tax Document Line 3.2 FPR - Tax 03.Medium
FPRXV438 Witholding Tax Item 3.2 FPR - Tax 03.Medium
FPRXV439 India Tax Detail 3.2 FPR - Tax 03.Medium
FPRXV440 Universal Journal Accounting Document Detail 3.2 FPR - Tax 03.Medium
FPRXV441 Spend Detail 3.2 FPR - Tax 03.Medium
FPRXV442 Witholding Tax Detail 3.2 FPR - Tax 03.Medium
FPRXV443 Vat Input Tax Detail 3.2 FPR - Tax 03.Medium
FPRXV476 India Ism Detail 3.2 FPR - Tax 03.Medium
FPRXV477 Tax Compliance Overview 3.2 FPR - Tax 03.Medium
FPRXV524 Capital Tool Detail 3.2 FPR - Tax 03.Medium
FPRXV525 Service Revenue Detail 3.2 FPR - Tax 03.Medium
### 4.2 3rd Party Reports

Active (7):

Object ID Description Status Sub-Tower Complexity FS % TDD % Build % FUT %
FPRXV158 Average Spends Report from HANA 09. FUT Overdue 3.2 FPR - Tax 03.Medium 1.0 1.0 1.0 0.45
FPRXV186 India - Customize report 09. FUT Overdue 3.2 FPR - Tax 03.Medium 1.0 1.0 1.0 0.8
FPRXV187 CAPEX forecasting report 07. FUT Not Started 3.2 FPR - Tax 03.Medium 1.0 1.0 1.0 0.0
FPRXV188 Consolidated VAT Report 09. FUT Overdue 3.2 FPR - Tax 03.Medium 1.0 1.0 1.0 0.9
FPRXR133 Capital Tool Report (Vietnam Reports) 02. FS Unplanned 3.2 FPR - Tax 03.Medium 0.0 0.0 0.0 0.0
FPRXR134 Service Revenue Report (Vietnam Reports) 02. FS Unplanned 3.2 FPR - Tax 03.Medium 0.0 0.0 0.0 0.0
FPRXR135 P-Unit report 02. FS Unplanned 3.2 FPR - Tax 03.Medium 0.0 0.0 0.0 0.0
Completed (9):
Object ID Description Sub-Tower Complexity
FPRXV052 Billing by Sell-to/Ship-to Country/State Report 3.2 FPR - Tax 03.Medium
FPRXV053 Sales Information for all US LE 3.2 FPR - Tax 03.Medium
FPRXV132 Tax Rollforward - accruals 3.2 FPR - Tax 03.Medium
FPRXV135 Comprehensive WHT report 3.2 FPR - Tax 03.Medium
FPRXV155 Costa Rica - AP INVOICE REPORT 3.2 FPR - Tax 03.Medium
FPRXV157 Argentina - AP INVOICE REPORT 3.2 FPR - Tax 03.Medium
FPRXV159 Cumulative Base Report from HANA 3.2 FPR - Tax 03.Medium
FPRXV163 Tax Account Summary Report 3.2 FPR - Tax 03.Medium
FPRXV164 GLAP report 3.2 FPR - Tax 03.Medium

5. Build Progress

5.1 Phase Completion

Object ID Description FS TDD Build FUT Status
FPRXV158 Average Spends Report from HANA May-25 (100%) Mar-26 (45%) 3. Off Track
FPRXV186 India - Customize report May-25 (100%) Feb-26 (80%) 1. On Track
FPRXV187 CAPEX forecasting report Apr-25 (100%) 3. Off Track
FPRXV188 Consolidated VAT Report Mar-25 (100%) Feb-26 (90%) 1. On Track
FPRXV526 GLAP Detail Mar-26 (100%) Mar-26 (100%) Mar-26 (100%) Apr-26 (90%)

5.2 Delivery Timeline

Phase On Track Off Track Not Started Avg Completion
Functional Spec 5 0 3 62%
Technical Design 5 0 3 62%
Build & TUT 5 0 3 62%
FUT 3 1 4 38%

6. Risk Items

RAID items will be populated from the Master RAID Log.

7. Change Requests

335 approved change requests impact this capability.

CR ID Title Priority Release Category Completion New Objs Descoped
INT-CR0013 Change in Treasury Scope High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0016 Blackline vs CFIN JE Tool High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0020 Plant Maintenance effort for SWAP (WIINGS) High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0032 Intercompany Transfer Pricing - PaPM High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0035 Release Change for Treasury Interface FPRI0168 … Medium R1 (May 2025) In Progress 0.0 2.0
INT-CR0036 Recon Reports for Automated Data Conversion Obj… High R1 (May 2025) Complete 0.0 0.0
INT-CR0037 Near Real Time Reporting on HANA SideCar for FPR Very High R1 (May 2025) In Progress 0.0 0.0
INT-CR0038 ECA/Analytics Recon Reports for Automated Data … High R1 (May 2025) Complete 0.0 0.0
INT-CR0040 R3 Stakeholder Assessment Medium R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0041 Improve Criteria for Extracting Cost Center Hie… Medium R1 (May 2025) Complete 0.0 0.0
INT-CR0042 ECA Recon Reports for Cost Center & Profit Cent… High R1 (May 2025) Complete 0.0 0.0
INT-CR0044 SAP Stock Room Management (SRM) for Returns War… Very High R3 (Feb 2027) In Progress 0.0 0.0
INT-CR0050 IAO - eHana ( Sidecar Hana) reports - Security High R2 (Aug 2025) Complete 0.0 0.0
INT-CR0051 Company code move to difference S4 instance 776… High R3 (Feb 2027) Complete 0.0 0.0
INT-CR0059 Split Load ready files in BODS & Improve extrac… Medium R1 (May 2025) Complete 0.0 0.0
INT-CR0060 Inclusion of logic for Batch Split scenario in … Medium R2 (Aug 2025) Complete 0.0 0.0
INT-CR0061 Commercial Invoice / KTBL Changes High R2 (Aug 2025) Complete 0.0 0.0
INT-CR0062 WRICEF object for Exchange Rates M,R,S,I - S4 c… Medium R1 (May 2025) In Progress 0.0 0.0
INT-CR0068 UIPath - Payment Remittance Advise High R3 (Feb 2027) Complete 10.0 0.0
INT-CR0069 Debit Credit Memo Report with approval status -… Medium R2 (Aug 2025) Complete 0.0 0.0
Showing top 20 of 335 change requests.

Generated by IAO Architecture Pipeline · May 2026 · Intel Confidential