🏠 Home FPR Tower Testing Report 📝 ADA Editor ↗
IAO Architecture

DC-040 — Perform Fixed Asset Accounting

Testing & Quality Report

Finance Plan to Report (FPR) Tower
Capability DC-040 · DC Manage Accounting and Control Data

IAO Program · R1 – R5
Generated: May 2026
Sajiv Francis

IAO Architecture Pipeline — Intel Confidential

Table of Contents

1. Executive Summary

This report provides the testing and quality status for Finance Plan to Report (FPR) — DC-040 Perform Fixed Asset Accounting sourced from JIRA (cached May 2026).

Metric Value
Total RICEFW Objects 367
Objects with Test Coverage 363 (99%)
Test Cases 0
Pass Rate 0%
Open Defects 18
Critical Defects 0
FUT Avg Completion 98%
Build Avg Completion 98%

2. Test Coverage

2.1 Coverage by RICEFW Type

RICEFW Type Total Objects FUT Started FUT % Avg Build % Avg
Interface 86 86 100% 100%
Conversion 25 25 96% 87%
Enhancement 220 216 97% 99%
Report 17 17 100% 100%
Form 1 1 100% 100%
Workflow 18 18 100% 100%
Total 367 363 98% 98%

2.2 Test Case Summary

Status Count %
Passed 0 0%
Failed 0 0%
Blocked 0 0%
Not Run 0 0%
Total 0 100%

3. Test Execution Status

3.1 Functional Unit Testing (FUT)

Object ID Type Description FUT % FUT Status Build %
FPRE1661_IF E WBS transfer tool 95% In Progress 100%
FPRE1599_IP E Update existing custom table ZTFPR_AC… 55% In Progress 100%
FPRE1599_IF E Update existing custom table ZTFPR_AC… 55% In Progress 100%
FPRE0880 E Cash concentration functionality for … 50% In Progress 100%
FPRC1724_IP C Creation of output template with cons… 55% In Progress 92%
FPRC1724_IF C Creation of output template with cons… 55% In Progress 92%
FPRE1741 E Mobile timesheet approval for Intel F… Not Started

3.2 Integration Testing

Test Scenario Status Related RICEFW Defects

3.3 User Acceptance Testing (UAT)

Test Scenario Status Sign-off Business Owner

4. Defect Analysis

4.1 Defects by Severity

Severity Open In Progress Resolved Total
High 9 1 23 33
Medium 7 1 13 21
Total 18 2 36 54

4.2 Defect Aging

Age Bucket Critical High Medium Low
0–7 days 0 2 7 0
8–14 days 0 1 0 0
15–30 days 0 5 0 0
31–60 days 0 2 1 0
60+ days 0 0 0 0

4.3 Open Defects

Showing 18 open/in-progress defects. 365 resolved defects are in the Resolved Defects Log.

Defect ID Severity Summary Status Assignee Days Open
IAODTM-8258 High finance.capital.fact_asset_tax_roll_forward inc… In Progress Quraishi, MdX 55
IAODTM-8494 High ECA Duplicate Asset Posting - FPRXV125 In Analysis Chauhan, AnkushX 40
IAODTM-8830 High FPRXV048 Lineage File Problems Re Opened Sharma, PragathiX 25
IAODTM-8819 High FPRXV041 Lineage File Problems Re Opened Sharma, PragathiX 25
IAODTM-8818 High FPRXV038 Lineage File Problems Re Opened Sharma, PragathiX 25
IAODTM-8803 High Gl account should be picked from ACDOCA instead… In Analysis Sharma, PragathiX 25
IAODTM-8976 High FPRXV044 Lineage File Problems 2 Re Opened Katariya, AnandX 19
IAODTM-9452 High SOURCE_SYSTEM_NM should be included in every IP… In Analysis Narula, RanjanX 10
IAODTM-9891 High ASSET_TIME_DEPENDENT join to COMPANY_PLANT_LOCA… To Do Narula, RanjanX 3
IAODTM-9968 High FPRXV238 Lineage Requirements Unclear To Do Narula, RanjanX 0
IAODTM-8651 Medium MATDOC Table usage in FPRXV049 In Analysis Sharma, PragathiX 32
IAODTM-9582 Medium Fixed Assets - Multiple Sample Reports FPRXV107… In Analysis Katariya, AnandX 7
IAODTM-9738 Medium AMT Full General Report - FPRXV128 In Analysis Chauhan, AnkushX 5
IAODTM-9810 Medium FPRXV105 - PO Details - Data Availability & Val… In Analysis Lakshmi Sowjanya, JeeruX 4
IAODTM-9785 Medium Custom fiori apps not available in BM1 and DM1 In Progress Sharma, PragathiX 4
IAODTM-9894 Medium Fixed Assets -FPRXV082 Cost Breakdown - Lineage… In Analysis Narula, RanjanX 3
IAODTM-9963 Medium Fixed Assets - FPRXV104 - Non-Valuated GR Aging… To Do Narula, RanjanX 0
IAODTM-9962 Medium Fixed Assets - FPRXV103 - Non-Valuated GR Aging… To Do Narula, RanjanX 0

5. Sprint Status

Sprint Start End Committed Completed Velocity

6. Go-Live Readiness

Criterion Status Evidence
All critical defects resolved ✅ Pass JIRA defect query
Test pass rate ≥ 95% ⚠️ 0% JIRA test execution
UAT sign-off obtained ⏳ Pending JIRA UAT board
No P0/P1 blockers open ✅ Clear JIRA issue tracker

Generated by IAO Architecture Pipeline · May 2026 · Intel Confidential