| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| DC-040 | Perform Fixed Asset Accounting | 6/10 | 24/33 | 64% | 59% | 100% | 24% | 🔴 RED |
DC-040 Totals: 6/10 L3 in-scope · 7/11 config complete · 270/461 Fit · 40/40 RICEFW complete · 11/45 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 11 |
| Config CDD Complete | 7 |
| Average Completion | 64% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| DC-040 | Perform Fixed Asset Accounting | 461 | 270 | 165 | 59% | — |
DC-040: 270/461 Fit-to-Standard (59%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| DC-040 | Perform Fixed Asset Accounting | 40 | 40 | 0 | — |
DC-040: 40/40 complete (100%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| DC-040 | Perform Fixed Asset Accounting | 45 | 11 | 34 | 24% | 51 |
DC-040: 11/45 ECA complete (24%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | DC-040 | ECA Incomplete | 34/45 ECA objects not complete (24%) | 🔴 HIGH |
Summary: 🔴 1 HIGH · 🟡 0 MEDIUM · 🔵 0 LOW