Finance Plan To Report (FPR) Tower
Capability DC-030
IAO Program
Generated: May 2026
Sajiv Francis
Companion to DC-030-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| DC-030 | Perform Closing | 96/96 | 654/654 | 17% | 64% | 95% | 67% | 🔴 RED |
DC-030 Totals: 96/96 L3 in-scope · 6/35 config complete · 423/659 Fit · 77/81 RICEFW complete · 20/30 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 35 |
| Config CDD Complete | 6 |
| Average Completion | 17% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| DC-030 | Perform Closing | 659 | 423 | 132 | 64% | — |
DC-030: 423/659 Fit-to-Standard (64%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| DC-030 | Perform Closing | 81 | 77 | 4 | — |
DC-030: 77/81 complete (95%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| DC-030 | Perform Closing | 30 | 20 | 10 | 67% | 3 |
DC-030: 20/30 ECA complete (67%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | DC-030 | Config Incomplete | Config at 17% (6/35) | 🔴 HIGH |
| 2 | DC-030 | ECA Incomplete | 10/30 ECA objects not complete (67%) | 🟡 MEDIUM |
Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
DC-030 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026