DC-020 — Process Readiness Detail

Manage the General Ledger

Finance Plan To Report (FPR) Tower
Capability DC-020

IAO Program
Generated: May 2026
Sajiv Francis

Companion to DC-020-Architecture.html — IAO Architecture Pipeline — Intel Confidential


Back to Architecture Document


Table of Contents

  1. Capability Readiness Summary
  2. Configuration Status
  3. User Story Coverage
  4. RICEFW Object Status
  5. Risk Flag Register

1. Capability Readiness Summary

L2 Code Description L3 (scope/total) L4 (scope/total) Config % Fit-to-Std % RICEFW % ECA % Status
DC-020 Manage the General Ledger 10/10 142/142 0% 86% 95% 67% 🔴 RED

DC-020 Totals: 10/10 L3 in-scope · 0/11 config complete · 128/148 Fit · 77/81 RICEFW complete · 20/30 ECA complete

2. Configuration Status

Per-L2 configuration tracker detail showing CDD completion against required items.

DC-020 — Manage the General Ledger

Metric Value
Config Items Required 11
Config CDD Complete 0
Average Completion 0%

3. User Story Coverage

Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.

L2 Code Description Total Fit Gap Fit % Gaps w/o RICEFW
DC-020 Manage the General Ledger 148 128 19 86%

DC-020: 128/148 Fit-to-Standard (86%)

4. RICEFW Object Status

Development object completion by L2 capability.

L2 Code Description Total Complete In Progress Not Started
DC-020 Manage the General Ledger 81 77 4

DC-020: 77/81 complete (95%)

4b. ECA Object Status

ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.

L2 Code Description Active Complete In Progress ECA % Rejected
DC-020 Manage the General Ledger 30 20 10 67% 3

DC-020: 20/30 ECA complete (67%)

Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.

7. Risk Flag Register

All automated risk flags detected across data sources.

# L2 Flag Detail Severity
1 DC-020 Config Incomplete Config at 0% (0/11) 🔴 HIGH
2 DC-020 ECA Incomplete 10/30 ECA objects not complete (67%) 🟡 MEDIUM

Summary: 🔴 1 HIGH · 🟡 1 MEDIUM · 🔵 0 LOW