Finance Plan To Report (FPR) Tower
Capability DC-010
IAO Program
Generated: May 2026
Sajiv Francis
Companion to DC-010-Architecture.html — IAO Architecture Pipeline — Intel Confidential
← Back to Architecture Document
| L2 Code | Description | L3 (scope/total) | L4 (scope/total) | Config % | Fit-to-Std % | RICEFW % | ECA % | Status |
|---|---|---|---|---|---|---|---|---|
| DC-010 | Perform Transaction Processing | 32/32 | 261/261 | 28% | 86% | 95% | 67% | 🟡 AMBER |
DC-010 Totals: 32/32 L3 in-scope · 9/32 config complete · 245/284 Fit · 77/81 RICEFW complete · 20/30 ECA complete
Per-L2 configuration tracker detail showing CDD completion against required items.
| Metric | Value |
|---|---|
| Config Items Required | 32 |
| Config CDD Complete | 9 |
| Average Completion | 28% |
Fit/Gap analysis from the User Story Tracker, grouped by L2 capability.
| L2 Code | Description | Total | Fit | Gap | Fit % | Gaps w/o RICEFW |
|---|---|---|---|---|---|---|
| DC-010 | Perform Transaction Processing | 284 | 245 | 34 | 86% | — |
DC-010: 245/284 Fit-to-Standard (86%)
Development object completion by L2 capability.
| L2 Code | Description | Total | Complete | In Progress | Not Started |
|---|---|---|---|---|---|
| DC-010 | Perform Transaction Processing | 81 | 77 | 4 | — |
DC-010: 77/81 complete (95%)
ECA (Enterprise Cloud Analytics) object completion by L2 capability — Reports, Views, Ingestion, and 3rd Party objects tracked in the ECA R3 Object Tracker.
| L2 Code | Description | Active | Complete | In Progress | ECA % | Rejected |
|---|---|---|---|---|---|---|
| DC-010 | Perform Transaction Processing | 30 | 20 | 10 | 67% | 3 |
DC-010: 20/30 ECA complete (67%)
Data Source: ECA [R3] IDM Object Tracker (Smartsheet). Rejected/cancelled objects excluded from active counts. Objects mapped via Sub-Tower Name → L2 capability.
All automated risk flags detected across data sources.
| # | L2 | Flag | Detail | Severity |
|---|---|---|---|---|
| 1 | DC-010 | Config Incomplete | Config at 28% (9/32) | 🟡 MEDIUM |
| 2 | DC-010 | ECA Incomplete | 10/30 ECA objects not complete (67%) | 🟡 MEDIUM |
Summary: 🔴 0 HIGH · 🟡 2 MEDIUM · 🔵 0 LOW
← Back to Architecture Document
DC-010 — Process Readiness Detail · Finance Plan To Report · Generated: May 2026